flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Boards at odds over North Carolina county’s CM-at-Risk policy

Boards at odds over North Carolina county’s CM-at-Risk policy

Wake County school officials favor CM-at-Risk, while commissioners are wary


August 14, 2014

The Wake County, North Carolina School Board is happy with its use of construction manager at risk for its construction projects, citing the ability to better keep projects on schedule. Some local small contractors are not pleased, though, with the board’s CM-at-Risk policy that was instituted in 2007. The county’s board of commissioners has offered a sympathetic ear to their complaints.

The key point of dispute is that under this delivery method, the construction manager prequalifies the subcontractors who can bid on the work. Some feel that as a result of this provision they are shut out of the process for work that was previously open to them.

These complaints helped lead to the passage of a state law last year requiring public entities to justify using CM-at-Risk for each project. Under this law, school staff will come back to the school board to request approval for using CM-at-Risk for most of the major projects funded by last fall’s bond issue.

At odds over this issue, the two boards have yet to reach consensus on how CM-at-Risk should be used on future school projects.

(http://www.newsobserver.com/2014/08/11/4059339/wake-county-schools-defend-use.html)

             

Related Stories

Codes and Standards | Nov 16, 2021

NOAA, Univ. of Maryland, and ASCE partner on climate-smart engineering codes, standards

Efforts will account for climate change in future infrastructure design and construction.

Codes and Standards | Nov 15, 2021

Intl. Code Council and Modular Building Institute release new off-site construction standards

‘Will create consistency for off-site construction; accelerate the industry’.

Codes and Standards | Nov 12, 2021

GSA will likely shrink federal office space post-COVID

Agency also needs to address maintenance backlog.

Codes and Standards | Nov 10, 2021

Los Angeles launches fast-track office tenant improvements program

Red tape to be cut to make interiors healthier and safer.

Codes and Standards | Nov 9, 2021

Florida state building professionals call for mandatory high-rise building inspections

Group recommendation comes in wake of Surfside condo collapse.

Codes and Standards | Nov 8, 2021

Dept. of Energy to fund 10 pilot smart building projects

Connected communities will accelerate renewable energy adoption and grid resilience.

Codes and Standards | Nov 3, 2021

Fact sheets offer strategies to improve indoor air quality in schools

Center for Green Schools at USGBC document for people without a technical background.

Codes and Standards | Nov 2, 2021

Rapid acceleration of affordable housing development expected over next five years

Federal government programs will spur construction.

Codes and Standards | Nov 1, 2021

New bird-friendly technical design guide released

National Glass Assn. document offers design and installation best practices for glazing.

Codes and Standards | Nov 1, 2021

World’s first chief heat officer tackles how to protect Miamians from extreme heat

Focus on chronic exposure for outdoor workers and for those that can’t afford AC.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021