flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Brighton Marine is the largest veterans’ development constructed in Boston since World War II

Multifamily Housing

Brighton Marine is the largest veterans’ development constructed in Boston since World War II

The Architectural Team designed the project.


By David Malone, Associate Editor | August 29, 2018
The Residences at Brighton Marine
The Residences at Brighton Marine

The Residences at Brighton Marine, a $46 million TOD community located in Boston, will provide 102 mixed-income apartment homes for veterans. The project is a joint venture between WinnDevelopment and non-profit veteran network community Brighton Marine.

The seven-story building is combined with an adapted historic structure to form a campus with 11 studio, 47 one-, 33 two-, and 11 three-bedroom apartments. 11 of the units will be set aside for households earning 30% of the area median income (AMI), 59 units for households earning 60% of the AMI, and 10 units for households at 80% of the AMI. The remaining 22 units will be at 120% of the AMI. Also included are on-site clinical, behavioral health, and family services.

 

See Also: $53 million Chamberlain apartments will comprise six buildings, three new and three renovated

 

Aerial view of the Residences at Brighton MarineCourtesy TAT.

 

The complex is located near public transit and a local job center and will complement an existing initiative by the non-profit Brighton Marine that helps homeless veterans and their families with money for security deposits, rent, outstanding utility bills, and moving expenses.

Related Stories

Multifamily Housing | Jun 4, 2020

Roof hatches selected for infill townhomes in Miami’s Little Havana neighborhood

Townhome project in Little Havana, Miam, Fla., uses BILCO roof hatches for reliability, code compliance.

Multifamily Housing | May 29, 2020

New multifamily project includes energy storage as an amenity

Each battery is linked to an on-site solar panel array.

Coronavirus | May 26, 2020

Multifamily developers report mounting delays in permitting and starts due to coronavirus pandemic

More than half (53%) of multifamily developer respondents reported construction delays in the jurisdictions where they operate, according to the third edition of the National Multifamily Housing Council (NMHC) COVID-19 Construction Survey.

Multifamily Housing | May 8, 2020

Nashville's newest residential tower will rise 416 feet

Goettsch Partners is designing the project.  

Multifamily Housing | May 8, 2020

'Lakehouse' is the first multifamily project in Colorado to receive WELL Precertification

Stantec and Muñoz + Albin are the project's architects.  

Senior Living Design | May 5, 2020

5 memory care communities with a strong sense of mission

Communities in California, Colorado, Florida, Maryland, and Virginia display excellence in memory care facility development, design, and construction.

Multifamily Housing | Apr 23, 2020

Tankless water heaters: 12 things to know about these energy savers for multifamily housing

Twelve factors to consider in using tankless water heaters in multifamily housing.

Multifamily Housing | Apr 20, 2020

Multifamily market flattens as construction proposal activity sinks

Multifamily has consistently been one of the strongest performers among 58 submarkets measured in PSMJ Resources’ quarterly survey.

Coronavirus | Apr 15, 2020

COVID-19 alert: 93% of renters in professionally managed multifamily housing paid some or all of their rent, says NMHC

In its second survey of 11.5 million units of professionally managed apartment units across the country, the National Multifamily Housing Council (NMHC) found that 84% of apartment households made a full or partial rent payment by April 12, up 15 percentage points from April 5.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021