flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Brooklyn’s ‘Batcave’ will become a series of fabrication shops

Reconstruction & Renovation

Brooklyn’s ‘Batcave’ will become a series of fabrication shops

The century-old building will be turned into fabrication shops in wood, metal, ceramics, textiles, and printmaking.


By David Malone, Associate Editor | March 16, 2017

Rendering courtesy Powerhouse Environmental Arts Foundation and Herzog & de Meuron.

The Brooklyn Rapid Transit Power Station, completed in 1903, was originally built to supply electricity to the local steam railroad, elevated railroad, and street car system. It consisted of two parts: the Turbine Hall and the Boiler House. About 50 years after its construction in the 1950s, the Power Station was decommissioned and the Boiler House component was demolished.

Since the time of its decommissioning, the Turbine Hall has sat abandoned with restricted access. In the early part of the new millennium, Brooklyn’s youth, drifters, and homeless dubbed the building the “Batcave,” and used its walls as a canvas for graffiti. In 2012, the Powerhouse Environmental Arts Foundation acquired the site in order to redevelop it into the Powerhouse Workshop.

After acquiring the property, the foundation tasked Herzog & de Meuron with redesigning the 113-year-old structure into a fabrication center to serve the working needs of artists. The existing Turbine Hall will be extensively renovated and the Boiler House, demolished in the 1950s, will be rebuilt. Fabrication shops dedicated to wood, metal, ceramics, textiles, and printmaking will all grace the renovated and rebuilt structure. Interior spaces will be flexible to allow for multiple workshop configurations depending on what is needed at a given time.

The main goal of Powerhouse is to support the working needs of artists and create a platform that provides employment in production and full-service fabrication, according to the projects website. In addition to the fabrication spaces, the Powerhouse will also hold public events and exhibitions.

Work on the project will begin in 2017 with the facility scheduled to open in 2020.

Related Stories

Retail Centers | Jul 17, 2017

Subway updates restaurants, brand with fresh design and improved customer experience

FRCH Design Worldwide is leading the redesign that will start with 12 pilot locations across the country.

Airports | Jun 26, 2017

Newark Liberty International Airport breaks ground on $2.4 billion redevelopment project

The project includes a new 1 million-sf terminal building with 33 domestic aircraft gates.

Retail Centers | Jun 21, 2017

Creating communities from defunct malls

It’s time to plan for the suburban retail reset—and it starts by rethinking the traditional mall.

Reconstruction & Renovation | May 30, 2017

Achieving deep energy retrofits in historic and modern-era buildings [AIA course]

Success in retrofit projects requires an entirely different mindset than in new construction, writes Randolph Croxton, FAIA, LEED AP, President of Croxton Collaborative Architects. 

Reconstruction & Renovation | Apr 27, 2017

One of the last abandoned high-rises in Detroit’s downtown core moves one step closer to renovation

Kraemer Design has been selected as the architect of record and historic consultant on the Detroit Free Press building renovations.

Office Buildings | Apr 18, 2017

Heineken USA Headquarters redesign emphasizes employee interaction

An open plan with social hubs maximizes co-working and engagement.

Reconstruction & Renovation | Mar 30, 2017

Waldorf Astoria New York to undergo massive renovation

Skidmore, Owings & Merrill and Pierre-Yves Rochon prepared the designs for what will be one of the most complex and intensive landmark preservation efforts in New York City history.

Office Buildings | Mar 27, 2017

New York warehouse to become an office mixing industrial and modern aesthetics

The building is located in West Chelsea between the High Line and West Street.

Reconstruction & Renovation | Mar 16, 2017

Pols are ready to spend $1T on rebuilding America’s infrastructure. But who will pick which projects benefit?

The accounting and consulting firm PwC offers the industrial sector a five-step approach to getting more involved in this process.

Reconstruction & Renovation | Feb 16, 2017

Stalled Conference House Park pavilion renovation moving forward

The pavilion has been awaiting repair since storm damage in 2011 rendered the structure unsafe for the public.

boombox1
boombox2
native1

More In Category

Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.



Brick and Masonry

A journey through masonry reclad litigation

This blog post by Walter P Moore's Mallory Buckley, RRO, PE, BECxP + CxA+BE, and Bob Hancock, MBA, JD, of Munsch Hardt Kopf & Harr PC, explains the importance of documentation, correspondence between parties, and supporting the claims for a Plaintiff-party, while facilitating continuous use of the facility, on construction litigation projects.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021