flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Brownfield goes green

Brownfield goes green

Chicago Center for Green Technology uses high-speed, energy-efficient hand dryers to share its green message and earn LEED credits.


June 4, 2012
The Chicago Center for Green Technology is the nations first rehabilitated muni
The Chicago Center for Green Technology is the nations first rehabilitated municipal building to receive LEED Platinum rating f

In 1995, the Chicago Department of Environment (CDOE) faced a formidable task. CDOE began clean-up of over 17 acres and 600,000 tons of concrete and construction debris dumped illegally by Sacramento Crushing, a company that was permitted to collect and recycle construction and demolition material but that had far exceeded the parameters of its permit.

The CDOE successfully fought Sacramento Crushing in court and not only closed down their operation but also became the owner of the site itself. By 1999, CDOE was the proud owner of a clean, uncontaminated site with a vacant building. Rather than simply renovating the structure using traditional building methods, they seized the opportunity to design and develop an environmentally sustainable building, using some of the most sophisticated green technology available. The CDOE enlisted the Chicago Chapter of the American Institute of Architects (AIA) Committee on the Environment and redesigned the building and property using LEED guidelines, as established by the USGBC.

Green from the ground up

The building, originally erected in 1952, now showcases over 40,000-sf of state-of-the-art environmental features including solar panels, rainwater collection for irrigation, recycled materials, smart lighting, a geothermal exchange system, and a green roof. It is the nation’s first rehabilitated municipal building to receive LEED Platinum rating from the USGBC.

The Center is home to a number of companies that focus on environmental and sustainable design. It also acts as a community resource and CDOE satellite office, offering a range of educational classes for professionals and homeowners and a testament that green technology is cost-effective and good for the environment.

Green never looked so good

Two years after opening, the Chicago Center for Green Technology installed high-speed XLERATOR hand dryers.

"With over 30,000 visitors per year, we were using an awful lot of paper towels," said Sarah Moloney, project coordinator for the City of Chicago. 

Unlike conventional hand dryers, which average 30 to 45 seconds of drying time, XLERATOR dries hands three times faster--completely in 10-15 seconds--and uses 80% less energy than conventional hand dryers. The hand dryer represents a 95% cost savings when compared to paper towels, reduces the need for maintenance, and improved restroom hygiene. It is also the only hand dryer that is Made in USA Certified, the first hand dryer to be GreenSpec Listed and helps facilities qualify for LEED credits.

In 2009, XLERATOR hand dryers with custom graphic covers were installed. These dryers include an educational “Good for the Environment” message for guests to read while drying their hands. In addition to offering superior functionality, the hand dryers’ sleek stainless steel covers compliment the facility’s modern design.

To meet the aesthetic needs of architects and designers, Excel Dryer Inc., manufacturer of XLERATOR, offers customers a wide range of finishes including traditional white, brushed stainless steel, vandalism-resistant bulk molded compound, fingerprint-resistant textured graphite, and other metallic finishes. +

Related Stories

| Aug 11, 2010

EwingCole to merge with healthcare specialist Robert D. Lynn Associates

EwingCole, a nationally recognized architectural, engineering, interior design, and planning firm with more than 320 professionals, today announced that it will combine its practice with Robert D. Lynn Associates of Philadelphia, a 40-person firm with a robust portfolio of healthcare projects. The combination will create the Delaware Valley¹s largest and most comprehensive firm with an emphasis on healthcare architecture, and a national scope and presence.

| Aug 11, 2010

Jacobs, Arup, AECOM top BD+C's ranking of the nation's 75 largest international design firms

A ranking of the Top 75 International Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

See what $3,000 a month will get you at Chicago’s Aqua Tower

Magellan Development Group has opened three display models for the rental portion of Chicago’s highly anticipated Aqua Tower, designed by Jeanne Gang. Lease rates range from $1,498 for a studio to $3,111 for a two-bedroom unit with lake views.

| Aug 11, 2010

AIANY partners with New York's building department to launch design competition for safer, more appealing sidewalk shed

The New York City Department of Buildings (DOB) and the New York Chapter of the American Institute of Architects (AIANY) today announced the launch of the urbanSHED International Design Competition with support from the Alliance for Downtown New York, ABNY Foundation, Illuminating Engineering Society New York City Section (IESNYC), and the New York Building Congress.

| Aug 11, 2010

Construction employment declines in 48 states in August compared to last year

Construction employment saw significant declines in all but two states this August compared to last year according to an analysis of new state-by-state employment figures released today by the federal government.  The analysis, conducted by the Associated General Contractors of America, however did show that the number of states gaining construction jobs increased slightly in August compared to July 2009.

| Aug 11, 2010

Stimulus funding helps get NOAA project off the ground

The award-winning design for the National Oceanic and Atmospheric Administration’s (NOAA) new Southwest Fisheries Science Center (SWFSC) replacement laboratory saw its first sign of movement on Sept 15 with a groundbreaking ceremony held in La Jolla, Calif. The $102 million project is funded primarily by the American Recovery and Reinvestment Act (ARRA), resulting in a rapidly advanced construction plan for the facility.

| Aug 11, 2010

New book on ‘Green Workplace’ by HOK’s Leigh Stringer, a BD+C 40 under 40 winner

The new book The Green Workplace is a comprehensive guide that demonstrates how green businesses can reduce costs, improve recruitment and retention, increase shareholder value, and contribute to a healthier natural environment.

| Aug 11, 2010

BIM adoption rate exceeds 80% among nation’s largest AEC firms

The nation’s largest architecture, engineering, and construction companies are on the BIM bandwagon in a big way, according to Building Design+Construction’s premier Top 170 BIM Adopters ranking, published as part of the 2009 Giants 300 survey. Of the 320 AEC firms that participated in Giants survey, 83% report having at least one BIM seat license in house, and nearly a quarter (23%) have 100-plus seats.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021