flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Building independence: New take on female power

Building independence: New take on female power

Memoir explores historic engineering project, women's empowerment era.


By By BD+C Staff | January 12, 2012
In Pipe Dream: An Alaskan Adventure, Deborah Brownlow brings readers along on a modern day "gold rush" as she provides an insigh

What is the root of a woman's independence? A new book is exploring the concept against the backdrop of one woman's role in a historic engineering project.

In Pipe Dream: An Alaskan Adventure, Deborah Brownlow brings readers along on a modern day "gold rush" as she provides an insightful and often humorous look into her role in the Trans-Alaska Pipeline System construction project in the 1970s. Not content with living a comfortable life in suburban Michigan, Brownlow recounts her quest for unknown horizons, unimagined experiences and her journey to find herself among a world of men.

"My book and I are one in the same," says Brownlow. "I have been given many opportunities to travel in my life, and fortunately have been able to fulfill my dreams of living the life of an explorer or pioneer."

Touching on discrimination issues and the rise of empowered women seeking equal pay, the book explores Alaska as the last frontier and overall humanity. Brownlow revisits her part in forging a path through unchartered land, in reference to both the geographic climate and her own work climate dominated by men.

Additionally, Pipe Dream provides insight into the challenging engineering project, complicated by extreme cold and isolated terrain.

"It was always my dream to become a part of history," says Brownlow. "In working on the Trans-Alaska Pipeline project, I found my opportunity to do so. Now, my strength lies in my sense of independence. I know I have the ability to accomplish anything thrown my direction, and I want to be a source of encouragement for other women."

For more information, visit www.dbbrownlow.net. BD+C

Related Stories

Multifamily Housing | Apr 12, 2024

Habitat starts leasing Cassidy on Canal, a new luxury rental high-rise in Chicago

New 33-story Class A rental tower, designed by SCB, will offer 343 rental units. 

Student Housing | Apr 12, 2024

Construction begins on Auburn University’s new first-year residence hall

The new first-year residence hall along Auburn University's Haley Concourse.

K-12 Schools | Apr 11, 2024

Eric Dinges named CEO of PBK

Eric Dinges named CEO of PBK Architects, Houston.

Construction Costs | Apr 11, 2024

Construction materials prices increase 0.4% in March 2024

Construction input prices increased 0.4% in March compared to the previous month, according to an Associated Builders and Contractors analysis of the U.S. Bureau of Labor Statistics’ Producer Price Index data released today. Nonresidential construction input prices also increased 0.4% for the month.

Healthcare Facilities | Apr 11, 2024

The just cause in behavioral health design: Make it right

NAC Architecture shares strategies for approaching behavioral health design collaboratively and thoughtfully, rather than simply applying a set of blanket rules.

K-12 Schools | Apr 10, 2024

A San Antonio school will provide early childhood education to a traditionally under-resourced region

In San Antonio, Pre-K 4 SA, which provides preschool for 3- and 4-year-olds, and HOLT Group, which owns industrial and other companies, recently broke ground on an early childhood education: the South Education Center.

University Buildings | Apr 10, 2024

Columbia University to begin construction on New York City’s first all-electric academic research building

Columbia University will soon begin construction on New York City’s first all-electric academic research building. Designed by Kohn Pedersen Fox (KPF), the 80,700-sf building for the university’s Vagelos College of Physicians and Surgeons will provide eight floors of biomedical research and lab facilities as well as symposium and community engagement spaces. 

K-12 Schools | Apr 10, 2024

Surprise, surprise: Students excel in modernized K-12 school buildings

Too many of the nation’s school districts are having to make it work with less-than-ideal educational facilities. But at what cost to student performance and staff satisfaction? 

Industrial Facilities | Apr 9, 2024

Confessions of a cold storage architect

Designing energy-efficient cold storage facilities that keep food safe and look beautiful takes special knowledge.

Cultural Facilities | Apr 8, 2024

Multipurpose sports facility will be first completed building at Obama Presidential Center

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021