A Spanish court ruled that famed architect Santiago Calatrava must pay 2.9 million euros (roughly $4 million) to a property development company, citing "shortcomings in his work" related to the Palacio de Congresos project in Oviedo, Spain, according to the Associated Press.
According to a report from The Guardian, Palacio de Congresos' infamous, huge mechanical visor has never worked because of problems with its hydraulics. Calatrava has been in an ongoing battle with the building's owners through the courts after they blamed him and refused to pay his full fees.
The architect is facing legal action in his home town, as well. As BD+C reported in December 2013, officials with the city of Valencia, Spain, are blaming Calatrava for the rapid deterioration of buildings within its City of Arts and Sciences complex.
And the owner of another Calatrava-designed project, Ysios winery in the rainy Alava region of northern Spain, say the building's dramatic, undulating roof is leaking.
Related Stories
| Dec 20, 2011
Third annual Gingerbread Build-off winners announced
Nine awards were handed out acknowledging the most unique and creative gingerbread structures completed.
| Dec 20, 2011
BCA’s Best Practices in New Construction available online
This publicly available document is applicable to most building types and distills the long list of guidelines, and longer list of tasks, into easy-to-navigate activities that represent the ideal commissioning process.
| Dec 20, 2011
Aragon Construction leading build-out of foursquare office
The modern, minimalist build-out will have elements of the foursquare “badges” in different aspects of the space, using glass, steel, and vibrantly painted gypsum board.
| Dec 20, 2011
HOAR Construction opens Austin, Texas office
Major projects in central Texas spur firm’s growth.
| Dec 19, 2011
HGA renovates Rowing Center at Cornell University
Renovation provides state-of-the-art waterfront facility.
| Dec 19, 2011
Chicago’s Aqua Tower wins international design award
Aqua was named both regional and international winner of the International Property Award as Best Residential High-Rise Development.
| Dec 19, 2011
Summit Design+Build selected as GC for Chicago recon project
The 130,000 square foot building is being completely renovated.
| Dec 19, 2011
USGBC welcomes new board directors?
Board responsible for articulating and upholding the vision, values, mission of organization.
| Dec 19, 2011
Davis Construction breaks ground on new NIAID property
The new offices will total 490,998 square feet in a 10-story building with two wings of 25,000 square feet each.
| Dec 19, 2011
Survey: Job growth driving demand for office and industrial real estate in Southern California
Annual USC Lusk Center for Real Estate forecast reveals signs of slow market recovery.