flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

CannonDesign expands its presence in Colorado with BWG acquisition

Engineers

CannonDesign expands its presence in Colorado with BWG acquisition

Future mergers could be in the offing.


By John Caulfield, Senior Editor | November 2, 2017

Colorado State University's 121,600-sf Behavioral Sciences Building in Fort Collins is one of the many higher education projects that Bennett Wagner Grody has worked on. Image: BWG

Growth-minded AEC firm CannonDesign announced this morning that it will merge with Denver-based Bennett Wagner Grody Architects (BWG), a 28-year AE firm with portfolio strengths in the K-12, Higher Education, and healthcare sectors.

This alliance gives CannonDesign its first office in Colorado, and represents its second acquisition within the past few months. In September, Cannon announced that it was joining forces with Houston-based design firm FKP, whose expertise extends to healthcare, science and technology.

CannonDesign did not disclose the terms of its agreement with BWG. But Brad Lukanic, AIA, who took over as CannonDesign’s CEO 15 months ago, indicated that this deal is part of his 102-year-old company’s larger ambitions to expand by linking with strategic partners. “We’re in the mode of looking at how our practice is evolving,” he tells BD+C. “The two recent mergers are key steps” in CannonDesign’s growth framework, and are expected to help the company expand its position in the education and S+T sectors.

 

Brad Lukanic, CannonDesign's CEO, says his company intends to continue growing organically and through mergers with strategic partners. Image: courtesy of CannonDesign

 

Don Grody, AIA, a founding partner at BWG, says that about a year ago his firm started thinking about its future within a consolidating AE industry, too. It concluded that prosperity hinged on locating the right partner firm. He says the company worked up a list of 200 AE firms, and targeted 20 of them with an information piece about BWG. “CannonDesign was one of the firms that responded positively to BWG as well as to the Colorado market.”

Grody says the merger “allows us to harness new services and expertise to help our clients leverage the built environment to improve performance and create stronger futures. It gives us a very distinct perspective in the industry.”

CannonDesign has coveted a bigger presence in Denver “for a very long time,” says Lukanic. BWG’s recent projects in the state include Colorado State University’s Behavioral Sciences Building, Colorado Mesa University’s Engineering Building, and numerous projects with Kaiser Permanente. CannonDesign’s work in Colorado includes the renovation and expansion of the University of Colorado at Boulder’s Student Recreation Center, the expansion of the University of Colorado Hospital’s Anschutz Inpatient Pavilion, and the U.S. Air Force Academy’s Holaday Athletic Center.

 

Don Grody, one of BWG's founding principals, is in charge of innovation, quality planing, and excellence at his firm. Image: courtesy of CannonDesign

 

BWG’s management team, including its three principals, is staying on with the company. BWG will operate as Bennett Wagner Grody Architects | CannonDesign, and while its brand will eventually disappear, that transition process “could be fairly long,” predicts Lukanic, because Cannon Design doesn’t want to lose any of BWG’s marketing cachet.

Once its merger with BWG is completed, CannonDesign will have nearly 1,000 employees working in 19 offices in North America and abroad.

As for future expansion, Lukanic says CannonDesign is tracking markets where populations are growing and where its core business sectors are strong. He points specifically to Texas as an area where the firm wants to be a bigger player, and to construction services as an area for potential increased business.

He says that CannonDesign is also looking at “a few key international markets” for expansion, both within and outside of North America.

Lukanic believes that, by operating multiple offices, CannonDesign has a better shot at attracting and retaining the “emerging leaders” it will need to be successful in the future. Its geographic diversity “gives our people more lifestyle options.”

Related Stories

Codes and Standards | Nov 2, 2022

New York City construction official wants to boost design-build

The new associate commissioner of alternative delivery in New York City’s Department of Design and Construction aims to encourage more design-build project delivery in the city.

University Buildings | Nov 2, 2022

New Univ. of Calif. Riverside business school building will support hybrid learning

  A design-build partnership of Moore Ruble Yudell and McCarthy Building Companies will collaborate on a new business school building at the University of California at Riverside.

Building Team | Nov 1, 2022

Nonresidential construction spending increases slightly in September, says ABC

National nonresidential construction spending was up by 0.5% in September, according to an Associated Builders and Contractors analysis of data published today by the U.S. Census Bureau.

40 Under 40 | Nov 1, 2022

40 Under 40 class of 2022 winners: Meet the architects

Of the up-and-coming AEC professionals to be named 40 Under 40 class of 2022 winners by the editors of Building Design+Construction, 22 make their living in the architecture profession.

K-12 Schools | Nov 1, 2022

Safety is the abiding design priority for K-12 schools

With some exceptions, architecture, engineering, and construction firms say renovations and adaptive reuse make up the bulk of their work in the K-12 schools sector.

| Nov 1, 2022

Updated Florida building codes helped newer homes withstand Hurricane Ian

Newer homes seemed to fare much better than older structures during Hurricane Ian, suggesting that updated Florida building codes made a difference.

Wood | Nov 1, 2022

A European manufacturer says its engineered wood products can store carbon for decades

  Metsä Wood, a Finland-based manufacturer of engineered wood products, says its sustainable, material-efficient products can store carbon for decades, helping to combat climate change. 

Data Centers | Oct 31, 2022

Data center construction facing record-breaking inflation, delays

Data center construction projects face record-breaking inflation amid delays to materials deliveries and competition for skilled labor, according to research from global professional services company Turner & Townsend.

School Construction | Oct 31, 2022

Claremont McKenna College science center will foster integrated disciplinary research

  The design of the Robert Day Sciences Center at Claremont McKenna College will support “a powerful, multi-disciplinary, computational approach to the grand socio-scientific challenges and opportunities of our time—gene, brain, and climate,” says Hiram E. Chodosh, college president.

Energy Efficient Roofing | Oct 28, 2022

Rooftop mini turbines can pair with solar panels

A new type of wind turbine can pair well on roofs with solar panels, offering a double source of green energy generation for buildings.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021