flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Casablanca Finance City Tower becomes Morphosis’ first project in Africa

High-rise Construction

Casablanca Finance City Tower becomes Morphosis’ first project in Africa

The tower is the first building completed in Casablanca Finance City.


By David Malone, Associate Editor | January 20, 2021
CFC Tower exterior at night

All photos: Jasmine Park

The 25-story Casablanca Finance City Tower has become the first project to be completed in the newly-established Casablanca Finance City, a new business district being developed in Morocco's Anfa District.

The Casablanca Finance City Tower’s design draws on the openness of the surrounding area, which gave the designers the opportunity in an otherwise dense city to highlight the relationship between the building and the natural environment. 

 

CFC facade

 

“The Casablanca Finance City Tower and its innovative design was conceived to have long-lasting impact and to signal a new era of economic prosperity for Morocco,” said Morphosis Founding Partner Thom Mayne in a release. “This tower brings together a range of global industries in the heart of the country, galvanizing international investment in North Africa, while also providing a template for the future development of the district as it continues to grow.”

 

Casablanca City Finance Tower interior elevator

 

A brise-soleil system wraps the building to protect against the sun while allowing the building to harness external elements to regulate natural light, air, and temperatures internally. The facade draws inspiration from traditional geometric patterned mosaics and wooden latticework screens characteristic of Moroccan architecture.

A tapered crown tops the 400-foot structure, while at street level the building engages the lower urban landscape with exterior public programming that invites the community into adjacent public spaces. This allows the building to serve as both a symbol of the city’s development and as a social hub that nurtures an active street life in the district.

Casablanca Finance City Tower is designed to achieve all LEED Gold certification.

 

CFC Tower ground level exterior

Related Stories

High-rise Construction | Aug 25, 2021

Summit One Vanderbilt immersive experience and observatory set to open

The project is located in the crown of One Vanderbilt.

Office Buildings | Aug 4, 2021

‘Lighthouse’ office tower will be new headquarters for A2A in Milan

The tower, dubbed Torre Faro, reimagines the company’s office spaces to adapt to people’s ever-changing needs at work.

High-rise Construction | May 27, 2021

The anti-high rise: Seattle's The Net by NBBJ

In this exclusive video interview for HorizonTV, Ryan Mullenix, Design Partner with NBBJ, talks with BD+C's John Caulfield about a new building in Seattle called The Net that promotes wellness and connectivity. 

Mixed-Use | Apr 22, 2021

Jakarta’s first supertall tower tops out

The project will anchor the Thamrin Nine development.

Products and Materials | Sep 23, 2020

A new portable restroom is designed for mobility

Lendlease invented the H3 Wellness Hub, which can include natural lighting and UV bacteria control.

High-rise Construction | Mar 20, 2020

Edge, the Western Hemisphere’s highest outdoor skydeck opens

The attraction is part of 30 Hudson Yards.  

High-rise Construction | Nov 6, 2019

AS+GG releases design scheme for the South HeXi Yuzui Financial District and Tower

The firm won an international design competition for the project in 2018.

High-rise Construction | Oct 7, 2019

A giant shipwreck sculpture highlights the proposal for Prague’s tallest building

Sculptor David Černý and architect Tomáš Císař from the studio Black n´ Arch designed the project.

High-rise Construction | Oct 4, 2019

KPF-designed CITIC tower is Beijing’s tallest

The tower is the fourth tallest in China and the eighth tallest in the world.

boombox1
boombox2
native1

More In Category




Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021