flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

CBRE completes acquisition of Heery International

Contractors

CBRE completes acquisition of Heery International

The deal is expected to expand the real-estate firm’s project management capacities in several U.S. sectors.


By John Caulfield, Senior Editor | November 13, 2017

As part of the new North Terminal Design project at Miami International Airport, Heery International designed new restaurant and retail spaces ranging from 1,500 to 10,000 sf. Aviation is one of the specialties that Heery is bringing to its new owner, CBRE Group. Image: Heery International

Balfour Beatty, the U.K.-based construction company, continued its strategy of selling off non-core assets with its recent sale of Atlanta-based design services and project management firm Heery International to a subsidiary of the real estate and consulting giant CBRE Group.

The October 30 acquisition, for which CBRE agreed to pay an estimated $57 million (42 million British pounds) in cash, was completed today.

Heery was founded in 1952. Balfour Beatty bought a 50% stake in Heery in 1986, and increased its holding to 100% four years later. However, that ownership sometimes precluded Balfour from acting as a project manager and bidding as a GC simultaneously on certain projects in the U.S. Heery’s sale to CBRE removes any conflict of interest from Balfour’s U.S. Buildings operations, and allows it to partner with Heery on future projects.

In 2016, the latest year for which results are available, Heery International had gross assets valued at the equivalent of $106.1 million, and generated pretax profit the equivalent of $3.2 million. It currently operates from 19 U.S. offices with 535 employees. Its services include project management, architecture, engineering, interior design, and commissioning.

CBRE maintains the largest network of professional commercial real estate project managers worldwide. Its more than 5,000 specialists, including 350-plus LEED-certified professionals, oversaw projects with a total contract value of more than $42 billion worldwide in 2016.

 

In a joint venture with H.J. Russell, Heery provided construction management services for Phase I of the Atlanta-Fulton Public Library System's capital improvement program, which entailed eight new libraries (155,000 sf) and two expanded libraries (81,000 sf). Image: Heery International

 

Mike Lafitte, CBRE’s Global Group President-Lines of Business, states that this acquisition should advance his company’s strategy to expand its project management expertise. “Heery has a strong track record of client service with many longstanding relationships spanning decades,“ he says. Lafitte points specifically to Heery’s relationships in the public and educational sectors. This acquisition will also extend CBRE’s reach into such vertical segments as aviation and sports, and add capabilities and expertise in design engineering services.

Ted Sak and Glenn Jardine, Heery’s President/CEO and Executive VP/COO, respectively, will continue to lead Heery under CBRE’s umbrella. 

Related Stories

Adaptive Reuse | Dec 21, 2022

University of Pittsburgh reinvents century-old Model-T building as a life sciences research facility

After opening earlier this year, The Assembly recently achieved LEED Gold certification, aligning with the school’s and community’s larger sustainability efforts.

Multifamily Housing | Dec 20, 2022

Brooks + Scarpa-designed apartment provides affordable housing to young people aging out of support facilities

In Venice, Calif., the recently completed Rose Apartments provides affordable housing to young people who age out of youth facilities and often end up living on the street. Designed by Brooks + Scarpa, the four-story, 35-unit mixed-use apartment building will house transitional aged youths.

Cladding and Facade Systems | Dec 20, 2022

Acoustic design considerations at the building envelope

Acentech's Ben Markham identifies the primary concerns with acoustic performance at the building envelope and offers proven solutions for mitigating acoustic issues.

Sponsored | Resiliency | Dec 14, 2022

Flood protection: What building owners need to know to protect their properties

This course from Walter P Moore examines numerous flood protection approaches and building owner needs before delving into the flood protection process. Determining the flood resilience of a property can provide a good understanding of risk associated costs.

Healthcare Facilities | Dec 14, 2022

In Flint, Mich., a new health center brings together children’s mental and physical health services

Families with children who experience behavioral health issues often have to travel to multiple care facilities to see multiple teams of specialists. In Flint, Mich., the new Center for Children’s Integrated Services at Genesee Health System (GHS), a public mental health provider, brings together all of the GHS children’s programs, including its behavioral health programs, under one roof. It provides families a single destination for their children’s mental healthcare.

Sponsored | Multifamily Housing | Dec 14, 2022

Urban housing revival: 3 creative multifamily housing renovations

This continuing education course from Bruner/Cott & Associates highlights three compelling projects that involve reimagining unlikely buildings for compelling multifamily housing developments.

HVAC | Dec 13, 2022

Energy Management Institute launches online tool to connect building owners with HVAC contractors

The National Energy Management Institute Inc. (NEMI) along with the Biden administration’s Better Air in Buildings website have rolled out a resource to help building owners and managers, school districts, and other officials find HVAC contractors.

Market Data | Dec 13, 2022

Contractors' backlog of work reaches three-year high

U.S. construction firms have, on average, 9.2 months of work in the pipeline, according to ABC's latest Construction Backlog Indicator. 

Green | Dec 9, 2022

Reaching carbon neutrality in building portfolios ranks high for organizations

Reaching carbon neutrality with their building portfolios ranks high in importance among sustainability goals for organizations responding to a Honeywell/Reuters survey of senior executives at 187 large, multinational corporations. Nearly nine in 10 respondents (87%) say that achieving carbon neutrality in their building portfolio is either extremely (58%) or somewhat (29%) important in relation to their overall ESG goals. Only 4% of respondents called it unimportant.

High-rise Construction | Dec 7, 2022

SOM reveals its design for Singapore’s tallest skyscraper

Skidmore, Owings & Merrill (SOM) has revealed its design for 8 Shenton Way—a mixed-use tower that will stand 63 stories and 305 meters (1,000 feet) high, becoming Singapore’s tallest skyscraper. The design team also plans to make the building one of Asia’s most sustainable skyscrapers. The tower incorporates post-pandemic design features.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021