flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Cedarville University's new dining facility includes a 300-seat Chick-fil-A

University Buildings

Cedarville University's new dining facility includes a 300-seat Chick-fil-A

DesignGroup designed the project.


By David Malone, Associate Editor | May 13, 2021
Cedarville University new dining facility addition exterior

Photos: © Wes Battoclette

Cedarville University has recently completed a 15,000-sf campus dining addition to its Centennial Library that provides the school’s over 4,000 students and faculty space for dining, studying, and gathering.

The new dining addition overlooks Cedar Lake and features floor-to-ceiling windows with views of the lake and the northern campus buildings. An industrial interior is paired with brightly colored seating and decor to create an open and flexible space for a variety of campus uses and student gatherings of all sizes.

 

Cedarville University new dining facility addition interior

 

The project also includes a 300-seat Chick-fil-A that offers a spacious and comfortable place to study and collaborate. The Chick-fil-A also provides an option for campus visitors during special events. Tossed: Salads and Pizza, provides a second dining option for students and faculty.

The project was completed in fall of 2020 at a cost of $7 million.

 

Cedarville University new dining facility addition interior

Related Stories

| Dec 19, 2011

HGA renovates Rowing Center at Cornell University

Renovation provides state-of-the-art waterfront facility.

| Dec 16, 2011

Goody Clancy-designed Informatics Building dedicated at Northern Kentucky University

The sustainable building solution, built for approximately $255-sf, features innovative materials and intelligent building systems that align with the mission of integration and collaboration. 

| Dec 5, 2011

Fraser Brown MacKenna wins Green Gown Award

Working closely with staff at Queen Mary University of London, MEP Engineers Mott MacDonald, Cost Consultants Burnley Wilson Fish and main contractor Charter Construction, we developed a three-fold solution for the sustainable retrofit of the building.

| Dec 2, 2011

Goody Clancy awarded Ohio State residential project

The project, which is focused on developing a vibrant on-campus community of learning for OSU undergraduates.

| Nov 23, 2011

Griffin Electric completes Gwinnett Tech project

Accommodating up to 3,000 students annually beginning this fall, the 78,000-sf, three-story facility consists of thirteen classrooms and twelve high-tech laboratories, in addition to several lecture halls and faculty offices.

| Nov 18, 2011

Centre for Interactive Research on Sustainability opens

Designed to exceed LEED Platinum, the Centre for Interactive Research on Sustainability (CIRS) is one of the most innovative and high performance buildings in North America today, demonstrating leading-edge green building design products, technologies, and systems.

| Nov 11, 2011

Streamline Design-build with BIM

How construction manager Barton Malow utilized BIM and design-build to deliver a quick turnaround for Georgia Tech’s new practice facility.

| Nov 11, 2011

AIA: Engineered Brick + Masonry for Commercial Buildings

Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam. 

| Nov 4, 2011

Two Thornton Tomasetti projects win NCSEA’s 2011 Excellence in Structural Engineering Awards

Altra Sede Regione Lombardia and Bank of Oklahoma Center both recognized.

boombox1
boombox2
native1

More In Category

Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021