The 225,000-sf Cherokee County Adult Detention Center was first completed in 2002, but has recently undergone a renovation project that included the addition of more than 110,000-sf of space to keep up with the county’s growing needs.
Through the expansion, the Center acquired a 582-bed housing tower composed of precast concrete modular cells with structural precast walls and floors, a load bearing CMU, and elevated cast-in-place concrete. 21-day rooms were specially designed for indirect supervision from elevated control towers and three exercise yards. Additional renovations took place in the kitchen, staff dining area, laundry facilities, visitation areas, the lobby, and the master control.
The existing kitchen was expanded to accommodate the increased number of meals needing to be prepared. The staff dining area was given improved finishes to create a more pleasing environment. The main control room was modified to increase the monitoring capabilities of the Sheriff’s staff to view all movement within the detention center.
Several previously unused areas were reinstated, including the original main detention entrance that had been unused for years by staff and the public. The area was renovated and modified to become the new video visitation site, creating a safe and efficient way for visitors to speak with inmates.
New public restrooms for visitors, a secure control station for the Sheriff’s staff to monitor visitor activities, 29 video visitation stations, space for 22 additional monitors, and six private attorney video visitation booths were also added.
CROFT provided the architectural design and construction administration services for the renovation/new service areas for the project. CROFT also served as a partner to Studio 8 for the housing pod addition and served as the construction administration lead for the 117,000 sq. ft., 600 bed addition to the Cherokee County Jail.
Related Stories
| Aug 26, 2013
13 must-attend continuing education sessions at BUILDINGChicago
Building Design+Construction's new conference and expo, BUILDINGChicago, kicks off in two weeks. The three-day event will feature more than 65 AIA CES and GBCI accredited sessions, on everything from building information modeling and post-occupancy evaluations to net-zero projects and LEED training. Here are 13 sessions I'm planning to attend.
| Aug 22, 2013
Energy-efficient glazing technology [AIA Course]
This course discuses the latest technological advances in glazing, which make possible ever more efficient enclosures with ever greater glazed area.
| Aug 22, 2013
6 visionary strategies for local government projects
Civic projects in Boston, Las Vegas, Austin, and suburban Atlanta show that a ‘big vision’ can also be a spur to neighborhood revitalization. Here are six visionary strategies for local government projects.
| Aug 20, 2013
Code amendment in Dallas would limit building exterior reflectivity
The Dallas City Council is expected to vote soon on a proposed code amendment that would limit a building’s exterior reflectivity of “visible light” to 15%.
| Aug 14, 2013
Green Building Report [2013 Giants 300 Report]
Building Design+Construction's rankings of the nation's largest green design and construction firms.
| Aug 14, 2013
Military Construction Report [2013 Giants 300 Report]
Building Design+Construction's rankings of the nation's largest military sector design and construction firms, as reported in the 2013 Giants 300 Report.
| Aug 12, 2013
Decade-long renovation of Kansas Capitol Building expected to be complete by year end
A $300 million-plus, decade-long renovation of the Kansas Capitol Building in Topeka is expected to be complete by the end of the year. The exterior refurbishing of copper over the four imposing wings and around the dome should be complete by late November.
| Aug 6, 2013
Sarabjit Singh named President of ITSI Gilbane and Gilbane Global
Gilbane Building Company announced today the appointment of Sarabjit Singh, P.E. as the new president of ITSI Gilbane (soon to be Gilbane Federal) and Gilbane Global, subsidiaries of Gilbane Building Company.
| Aug 6, 2013
CoreNet: Office space per worker shrinks to 150 sf
The average amount of space per office worker globally has dropped to 150 square feet or less, from 225 square feet in 2010, according to a recent global survey conducted by CoreNet Global.
| Jul 30, 2013
In support of workplace chatter
As the designers of collaborative work environments, architects and engineers understand how open, transparent spaces can cultivate the casual interaction and knowledge sharing that sparks innovation. Now a new study reveals another potential benefit of open workplaces: social interaction that supports happier employees.