flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Chicago unveils $1.1 billion plan for DePaul arena, Navy Pier upgrades

Chicago unveils $1.1 billion plan for DePaul arena, Navy Pier upgrades

Deal also includes two hotels near McCormick Place convention center south of Loop.


By Crain's Chicago Business | May 16, 2013
The McCormick district plan, courtesy TVS Design
The McCormick district plan, courtesy TVS Design

Crain's Chicago Business' Greg Hinz sheds light on a bold plan by Mayor Rahm Emanuel to boost the city's tourism and entertainment industries. The Emanuel administration earlier this week announced details on two separate projects that combined represent more than $1 billion in investments.

Hinz writes:

In one, a final deal has been struck to build a 10,000-seat arena across the street from McCormick Place that will be the new home of the DePaul Blue Demons basketball team and host smaller conferences, meetings, concerts and other sporting events. As part of that undertaking, a 500-room hotel will be erected kitty-corner from a 1,100-room "headquarters" hotel that already had been announced.

 

 

In the other initiative, Mayor Rahm Emanuel's team announced that it's ready to move ahead with the first, $163 million phase of the redevelopment of Navy Pier. Included: a new park and bicycle flyover at the pier's west end, an expanded Children's Museum and 54,000 square feet of new dining and entertainment space, mostly on the pier's lightly used east end.

Read the report by Crain's Chicago Business.

 

Related Stories

| Jan 3, 2012

Callison acquires Barteluce Architects & Associates

This acquisition will grow Callison’s New York team to over 75 architects.

| Jan 3, 2012

VDK Architects merges with Harley Ellis Devereaux

Harley Ellis Devereaux will relocate the employees in its current Berkeley, Calif., office to the new Oakland office location effective January 3, 2012.

| Jan 3, 2012

Weingarten, Callan appointed to BD+C Editorial Board

Building Design+Construction has named two new members to its editorial board. Both are past recipients of BD+C’s “40 Under 40” honor.

| Jan 3, 2012

New Chicago hospital prepared for pandemic, CBR terror threat

At a cost of $654 million, the 14-story, 830,000-sf medical center, designed by a Perkins+Will team led by design principal Ralph Johnson, FAIA, LEED AP, is distinguished in its ability to handle disasters. 

| Jan 3, 2012

BIM: not just for new buildings

Ohio State University Medical Center is converting 55 Medical Center buildings from AutoCAD to BIM to improve quality and speed of decision making related to facility use, renovations, maintenance, and more. 

| Jan 3, 2012

New SJI Rule on Steel Joists

A new rule from the Steel Joist Institute clarifies when local reinforcement of joists is required for chord loads away from panel points. SJI members offer guidance about how and when to specify loads.

| Jan 3, 2012

AIA Course: New Developments in Concrete Construction

Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.

| Jan 3, 2012

The Value of Historic Paint Investigations

An expert conservator provides a three-step approach to determining a historic building’s “period of significance”—and how to restore its painted surfaces to the correct patterns and colors. 

| Jan 3, 2012

28th Annual Reconstruction Awards: Bringing Hope to Cancer Patients

A gothic-style structure is reconstructed into comfortable, modern patient residence facility for the American Cancer Society.

| Jan 3, 2012

Art Gensler: Still Making a Difference for Clients Every Day

After running what is today the largest architecture firm in the world for more than four decades, M. Arthur Gensler, Jr., FAIA, FIIDA, RIBA, is content to be just another employee at the firm that bears his name. 

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021