flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Comcast to build second Philadelphia skyscraper, with Norman Foster-designed tower [slideshow]

Comcast to build second Philadelphia skyscraper, with Norman Foster-designed tower [slideshow]

The British architect last week unveiled his scheme for the $1.2 billion, 59-story Comcast Innovation and Technology Center, planned adjacent to the Comcast Center. 


By BD+C Staff | January 21, 2014
Renderings courtesy Foster + Partners, Comcast Corp.
Renderings courtesy Foster + Partners, Comcast Corp.

Comcast Corporation announced last week its plan to build a second skyscraper in Philadelphia, adjacent to its current global headquarters, the 58-story, 973-foot Comcast Center.

The new building, designed by Norman Foster's Foster + Partners, will surpass the Comcast HQ by nearly 148 feet and will stand as the nation's tallest building outside of New York and Chicago, as well as one of the world's 40 tallest skyscrapers.

The joint development with Liberty Property Trust will house a 200-room Four Seasons hotel, a media center for local broadcast television stations, and office space. 

Here is the Comcast press release on the project:

Comcast Corporation and Liberty Property Trust announced that they will jointly develop the Comcast Innovation and Technology Center on the 1800 block of Arch Street in Center City Philadelphia.  

 

 

The proposed $1.2 billion 59-story, 1,121-foot tower will neighbor Comcast Center, Comcast Corporation’s global headquarters, and become a dedicated home for the company’s growing workforce of technologists, engineers, and software architects.  

The facility will also create a media center in the heart of the City by becoming home to the operations of local broadcast television stations NBC 10/WCAU and Telemundo 62/WWSI and offer space for local technology startups.

Designed by world-renowned architect Lord Norman Foster of Foster + Partners, the glass and stainless steel tower will complement Comcast Center as a new energetic dimension to Center City.  

The 1.517 million rentable square foot project will include a new Four Seasons hotel and a soaring, block-long lobby with a glass-enclosed indoor plaza accompaniment to Comcast Center’s existing, dynamic outdoor plaza.  The lobby will feature a restaurant and a new concourse will provide direct connections with SEPTA’s Suburban Station, enhancing accessibility and providing new options for commuters.  

 

 

The $1.2 billion mixed-use tower is expected to be the tallest building in the United States outside of New York and Chicago and will be the largest private development project in the history of Pennsylvania. 

"This is yet another historic moment for Comcast," said Brian L. Roberts, Chairman and CEO, Comcast Corporation. "We continue to be proud to call Philadelphia our home, and are thrilled to build a world-class media, technology and innovation center right in the heart of the City, to bring NBC 10 and Telemundo 62 downtown, and to create thousands of jobs and further drive economic activity in the region. We have assembled an incredible design and development team to expand our vertical campus, and I am more excited than ever about the future of Comcast in Philadelphia."

Liberty Property Trust Chairman and CEO William P. Hankowsky said, "Liberty is thrilled to again have the opportunity to develop a transformative project for the city of Philadelphia, a project that will significantly contribute to the continuing renaissance of Center City as a forward-looking yet uniquely livable urban environment."  

Lord Norman Foster commented, "This is a very special project. It is an opportunity to create a unique and sustainable model for mixed-use, high density development, which uniquely combines spaces for high tech research and development with restaurants, gardens, fitness facilities and a significant public reception space – a window on Philadelphia. At ground level this ‘urban room’ embraces the city; it opens the building to the public and anchors it as a vital new neighborhood. It also links directly into the below ground public transport system. Above this, the highly flexible loft-like spaces and studios are designed for a dynamic way of working – an engine for the city’s evolution as the kind of leading technology hub presently associated with Silicon Valley.  We look forward to continuing our collaboration with Comcast and Liberty Property Trust to further develop an outstanding location and a new landmark on the Philadelphia skyline."

 

 

In addition to office space, the Comcast Innovation and Technology Center will house a Four Seasons hotel, featuring more than 200 rooms.  The luxury hotel will include world-class spa, fitness, event and meeting facilities as well as an exciting new restaurant located on the top floor of the building, offering spectacular 360 degree city views.

"Four Seasons has called Philadelphia home for more than 30 years," said Scott Woroch, Executive Vice President Worldwide Development, Four Seasons Hotels and Resorts. "During this time we have set the standard for luxury hospitality in the city and become an integral part of the community. Today, Philadelphia is experiencing renewed growth and popularity. We are proud to be a part of one of the largest, most exciting new developments in the region and reaffirm our long-standing commitment to this great city."

Four Seasons will continue to manage its existing hotel at 1 Logan Square and assist the owner with the transition to a new brand prior to the expected opening of the new hotel in 2017.   

Read the full release at: http://corporate.comcast.com/news-information/news-feed/comcast-innovation-technology-center-press-release

 

Related Stories

Student Housing | Apr 19, 2024

$115 million Cal State Long Beach student housing project will add 424 beds

A new $115 million project recently broke ground at California State University, Long Beach (CSULB) that will add housing for 424 students at below-market rates. The 108,000 sf La Playa Residence Hall, funded by the State of California’s Higher Education Student Housing Grant Program, will consist of three five-story structures connected by bridges.

Construction Costs | Apr 18, 2024

New download: BD+C's April 2024 Market Intelligence Report

Building Design+Construction's monthly Market Intelligence Report offers a snapshot of the health of the U.S. building construction industry, including the commercial, multifamily, institutional, and industrial building sectors. This report tracks the latest metrics related to construction spending, demand for design services, contractor backlogs, and material price trends.

MFPRO+ New Projects | Apr 16, 2024

Marvel-designed Gowanus Green will offer 955 affordable rental units in Brooklyn

The community consists of approximately 955 units of 100% affordable housing, 28,000 sf of neighborhood service retail and community space, a site for a new public school, and a new 1.5-acre public park.

Construction Costs | Apr 16, 2024

How the new prevailing wage calculation will impact construction labor costs

Looking ahead to 2024 and beyond, two pivotal changes in federal construction labor dynamics are likely to exacerbate increasing construction labor costs, according to Gordian's Samuel Giffin.

Healthcare Facilities | Apr 16, 2024

Mexico’s ‘premier private academic health center’ under design

The design and construction contract for what is envisioned to be “the premier private academic health center in Mexico and Latin America” was recently awarded to The Beck Group. The TecSalud Health Sciences Campus will be located at Tec De Monterrey’s flagship healthcare facility, Zambrano Hellion Hospital, in Monterrey, Mexico.

Market Data | Apr 16, 2024

The average U.S. contractor has 8.2 months worth of construction work in the pipeline, as of March 2024

Associated Builders and Contractors reported today that its Construction Backlog Indicator increased to 8.2 months in March from 8.1 months in February, according to an ABC member survey conducted March 20 to April 3. The reading is down 0.5 months from March 2023.

Laboratories | Apr 15, 2024

HGA unveils plans to transform an abandoned rock quarry into a new research and innovation campus

In the coastal town of Manchester-by-the-Sea, Mass., an abandoned rock quarry will be transformed into a new research and innovation campus designed by HGA. The campus will reuse and upcycle the granite left onsite. The project for Cell Signaling Technology (CST), a life sciences technology company, will turn an environmentally depleted site into a net-zero laboratory campus, with building electrification and onsite renewables.

Codes and Standards | Apr 12, 2024

ICC eliminates building electrification provisions from 2024 update

The International Code Council stripped out provisions from the 2024 update to the International Energy Conservation Code (IECC) that would have included beefed up circuitry for hooking up electric appliances and car chargers.

Urban Planning | Apr 12, 2024

Popular Denver e-bike voucher program aids carbon reduction goals

Denver’s e-bike voucher program that helps citizens pay for e-bikes, a component of the city’s carbon reduction plan, has proven extremely popular with residents. Earlier this year, Denver’s effort to get residents to swap some motor vehicle trips for bike trips ran out of vouchers in less than 10 minutes after the program opened to online applications.

Laboratories | Apr 12, 2024

Life science construction completions will peak this year, then drop off substantially

There will be a record amount of construction completions in the U.S. life science market in 2024, followed by a dramatic drop in 2025, according to CBRE. In 2024, 21.3 million sf of life science space will be completed in the 13 largest U.S. markets. That’s up from 13.9 million sf last year and 5.6 million sf in 2022.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021