flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Construction permits exceeded $2 billion in Minneapolis in 2014

Construction permits exceeded $2 billion in Minneapolis in 2014

Two major projects are driving commercial and residential building activity. 


By John Caulfield, Senior Editor | January 6, 2015
Photo: Jdkoenig via Wikimedia Commons
Photo: Jdkoenig via Wikimedia Commons

Minneapolis achieved a construction milestone in 2014, when for the first time it issued $2 billion in new building permits in a single year. 

The Star Tribune reports that two major projects—a new stadium for the Minnesota Vikings NFL team and the city’s Downtown East redevelopment—accounted for about half of the total worth of the permits issued. About one third of the total permits issued were for more than 2,000 housing units, the vast majority of which will be multifamily dwellings. 

More than 65% of the new permits were issued for projects in Minneapolis’s Ward 3, which encompasses the North Loop, Downtown East, the downtown riverfront, and northeast Minneapolis. 

Doug Kress, the city’s director of development services, told the Star Tribune that the stadium project has sparked development in the surrounding areas. “There’s a lot of growth in Minneapolis in both downtown and our neighborhoods,” he’s quoted as saying. (Minneapolis ranks 16th as a metropolitan region in population in the U.S., with 3.42 million residents.)

This metro is looking for permit growth to continue in 2015. The Star Tribune reports that at least 10 projects around the city have received land-use approval. And portions of the Vikings stadium and Downtown East projects have yet to be permitted. 

Mayor Betsy Hodges believes the permitting activity is evidence of a vote of confidence that investors, workers, business owners, and residents are giving to the city’s future. “I look forward to building on this momentum as we continue to attract new residences, businesses, and investment,” she told the Star Tribune.

Related Stories

| Sep 14, 2011

Lend Lease’s role in 9/11 Memorial & Museum

Lend Lease is honored to be the general contractor for the National September 11 Memorial & Museum project at the World Trade Center site in New York City.

| Sep 14, 2011

Thornton Tomasetti’s Poon named to the Council on Tall Buildings and Urban Habitat’s Board of Trustees

 During his 30-plus years of experience, Poon has been responsible for the design and construction of super high-rise structures, mixed-used buildings, hotels, airports, arenas and residential buildings worldwide. 

| Sep 12, 2011

PVs play new roles as a teaching tool

Solar installations are helping K-12 schools around the country save money and teach students the intricacies of renewable energy sources.

| Sep 12, 2011

Living Buildings: Are AEC Firms up to the Challenge?

Modular Architecture > You’ve done a LEED Gold or two, maybe even a LEED Platinum. But are you and your firm ready to take on the Living Building Challenge? Think twice before you say yes.

| Sep 12, 2011

First phase of plan to revitalize Florida's Hialeah Park announced

This is the first project of a master plan developed to revive the historic racetrack. 

| Sep 9, 2011

Kauffman Center for the Performing Arts in Kansas City opens this month

Theatre Projects played the lead role in theatre design and planning as well as in engineering the customized theatre equipment. BNIM in Kansas City served as the executive architect.

| Sep 9, 2011

$22 million investment made in energy efficient building maker

The buildings use at least 25% less energy than the strictest building codes in the U.S., and as much as 80% less energy in certain parts of the country. 

| Sep 8, 2011

Two promoted at ajc architects

ajc architects announced the promotion of Joshua W. Greene, AIA, NCARB, LEED Green Associate to Associate Principal of the firm. The firm also announced that Kent Rigby, AIA, has been promoted to Associate Architect.

| Sep 7, 2011

KSS Architects wins AIA NJ design award

The project was one of three to win the award in the category of Architectural/Non-Residential. 

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021