flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Construction problems at prison spur support to quash non-traditional project delivery in Iowa

Codes and Standards

Construction problems at prison spur support to quash non-traditional project delivery in Iowa

Legislators may remove exceptions to design-bid-build.


By Peter Fabris, Contributing Editor | March 5, 2015
Construction problems at prison spur support to quash non-traditional project delivery in Iowa

The state university system would be one of the entities most impacted by changes to state law on project delivery. Photo: via Pixabay

Iowa lawmakers are investigating construction problems at the Fort Madison prison project and are scrutinizing rules regarding project delivery on state projects, according to a Des Moines Register report.

The prison will require $25 million to fix geothermal heating and ventilation systems. Legislators are pointing fault at the construction management arrangement that had private construction managers overseeing the project. 

In 2011, Iowa’s Department of Administrative Services eliminated the requirement for traditional design-bid-build and laid off state staff who had overseen construction projects. In the wake of sharp public scrutiny of the prison project, there is growing bi-partisan support to return project delivery rules to design-bid-build. Bills have been introduced in the state House and Senate to do just that.

The state university system would be one of the entities most impacted by changes to state law on project delivery.

Related Stories

Codes and Standards | Aug 12, 2021

AGC pushes for more environmentally friendly construction

Contractor trade group supports government investment, tax incentives to reduce carbon footprints.

Codes and Standards | Aug 11, 2021

Decentralized approach to codes means emissions reduction responsibility falls on local officials

Efficiency advocates focusing more on local code amendments.

Digital Twin | Aug 9, 2021

Digital Twin Maturity white paper offers guidance on digital twin adoption

Provides lifecycle map and an approach for incorporating digital twins.

Codes and Standards | Aug 5, 2021

Contractors can be liable for building failures many years after project completion

Personal injury suits could be brought decades after substantial completion.

Codes and Standards | Aug 4, 2021

Mass timber is a natural choice for building recycling through deconstruction

Designing wood buildings to optimize recovery of materials for disassembly aids carbon sequestration.

Codes and Standards | Aug 3, 2021

Dept. of Energy releases initial version of the Spawn of EnergyPlus software

Targets new use cases in advanced controls, district systems, and grid integration.

Codes and Standards | Aug 2, 2021

Several U.S. cities among most expensive places to build in the world

San Francisco, New York, and Boston head the domestic list.

Codes and Standards | Jul 28, 2021

American Concrete Institute creates new director of innovative concrete technology post

Aim is to attract emerging technologies for development.

Codes and Standards | Jul 28, 2021

Higher ed faces infrastructure backlog of $112.3 billion

Study recommends integrated strategic planning for best results.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021