flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Construction team chosen for world's tallest building in Jeddah, Saudi Arabia

Construction team chosen for world's tallest building in Jeddah, Saudi Arabia

Mace, EC Harris will oversee building of 1,000-meter, $1.2 billion Kingdom Tower.


By BD+C Staff | February 21, 2013
At more than 1 km, Kingdom Tower will be the world's tallest building.
At more than 1 km, Kingdom Tower will be the world's tallest building.

A joint venture consisting of Mace and consultant EC Harris will oversee the construction of Kingdom Tower: a 1,000-meter project proposed as the tallest building in the world. Saudi firm Binladen Group will build the skyscraper, which will be three to four times as tall as London's Shard, another Mace/Harris project. An interdisciplinary team led by Adrian Smith + Gordon Gill Architecture designed the 500,000-square-meter project, which will combine a luxury hotel, apartments, office space, and an observatory.

The Harris/Mace joint venture incorporates the tall-buildings expertise of EC Harris and RISE, a sister firm within ARCADIS, and Mace, an international company. Together the firms have delivered more than 100 tall buildings worldwide. Construction is projected to begin later this year and take more than five years.

The tower is planned as the centerpiece of the Kingdom City development, a project of the Jeddah Economic Company. The design for the urban project will include residential, commercial, hotel, offices, retail, educational, and commercial properties. 

(http://www.echarris.com/reference/news/kingdom_tower.aspx)

(Gizmodo image via Construction Enquirer)

Related Stories

| Oct 11, 2011

ThyssenKrupp elevator cabs validated by UL Environment

The conclusive and independent third-party validation process is another step toward a green product line.

| Oct 11, 2011

Ballard Spahr launches real estate recovery group

  The new group represents an expansion of the company’s Distressed Real Estate Initiative, which was launched in 2008 to help clients throughout the country plan, adapt and prosper in a challenging economic environment. 

| Oct 11, 2011

Onex completes investment in JELD-WEN

With the completion of the JELD-WEN investment, Onex Partners III is approximately 40% invested.

| Oct 7, 2011

GREENBUILD 2011: Demand response partnership program announced at Greenbuild 2011

  Program will use USGBC’s newly revised LEED Demand Response credit as an implementation guideline and leverage its relationships with the building community to foster adoption and participation in existing utility and solution provider demand response offerings. 

| Oct 7, 2011

GREENBUILD 2011: Otis Elevator announces new contracts for sustainable building projects

  Wins reinforce Otis’ position as leader in energy-efficient products.

| Oct 7, 2011

GREENBUILD 2011: UL Environment releases industry-wide sustainability requirements for doors

  ASSA ABLOY Trio-E door is the first to be certified to these sustainability requirements.

| Oct 7, 2011

GREENBUILD 2011: UL Environment clarifies emerging environmental product declaration field

  White paper defines EPD, details development process, and identifies emerging trends for manufacturers, architects, designers, and buyers.

| Oct 7, 2011

GREENBUILD 2011: Otis Elevator introduces energy-efficient escalator

The energy-efficient NCE escalator from Otis offers customers substantial “green” benefits.

| Oct 7, 2011

GREENBUILD 2011: Schools program receives grant to track student conservation results

To track results, schools will use the newly developed Sustainability Dashboard, a unique web-based service that makes tracking sustainability initiatives affordable and easy.

| Oct 7, 2011

GREENBUILD 2011: Transparent concrete makes its North American debut at Greenbuild

  The panels allow interior lights to filter through, from inside. 

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021