flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Construction of Vietnam’s tallest building commences in Ho Chi Minh City

High-rise Construction

Construction of Vietnam’s tallest building commences in Ho Chi Minh City

The tower will surpass Chicago’s Willis Tower and Kuala Lumpur’s Petronas Towers in height.


By Adilla Menayang, Assistant Digital Editor | August 4, 2015
Arup, Atkin, Mixed-use, Vietnam, Ho Chi Minh

The tower is made out of a cluster of 25 rectangular tubes jutting out of the ground at varying heights. Renderings courtesy Atkins

A 1,509-foot skyscraper broke ground on the banks of the Saigon River in Ho Chi Minh City, Vietnam, Dezeen reports.

The tower was designed by British architecture firm Atkins, and is poised to be the tallest building in Vietnam once completed.

Its 81 stories gives the tower its name, The Vincom Landmark 81, developed by Vingroup, and will serve as a mixed-use tower.

Renderings that have been released depict a tower made out of a cluster of 25 rectangular tubes jutting out of the ground at varying heights. The shorter tubes will be topped with roof gardens.

A total of 2.59 million sf will host a hotel, serviced residential apartments, and retail space.

Atkins is in charge of both the architecture and landscape design, and Arup will collaborate on the design and construction of the skyscraper.

Dezeen has the full report.

 

Related Stories

| Feb 13, 2013

'Vegetative tower' apartments to revive NYC site

A Manhattan site formerly slated for development with a "tower of cubes"—a now-defunct project by Santiago Calatrava—will be revived with a 998-foot, 300,000-sf apartment building by Morali Architects.

| Jul 9, 2012

Modular Construction Delivers Model for New York Housing in Record Time

A 65-unit supportive housing facility in Brooklyn, N.Y., was completed in record time using modular construction with six stories set in just 12 days.

| Jul 2, 2012

San Francisco lays claim to the greenest building in North America

The 13-floor building can hold around 900 people, but consumes 60% less water and 32% less energy than most buildings of its kind.

| Jun 13, 2012

Thornton Tomasetti founding principals receive CTBUH Fazlur R. Khan Lifetime Achievement Medal

This is the first time the CTBUH Board of Trustees has awarded the prize to two individuals jointly.

| Jun 6, 2012

KPF designs tower for Yongsan IBD

The master plan, created by Studio Daniel Libeskind, is a dynamic urban environment containing contributions from 19 different architects practicing in diverse locations around the globe.

| Jun 6, 2012

SOM urges Chicago tenants to partner with landlords to cut energy use

Tenants can exceed building energy challenge targets recently announced by Mayor Emanuel.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

boombox1
boombox2
native1

More In Category




Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021