flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Contractors' backlog of work reaches three-year high

Market Data

Contractors' backlog of work reaches three-year high

U.S. construction firms have, on average, 9.2 months of work in the pipeline, according to ABC's latest Construction Backlog Indicator. 


By Associated Builders and Contractors | December 13, 2022
Contractors' backlog of work reaches three-year high Image by Denis Doukhan from Pixabay
Image by Denis Doukhan from Pixabay

Associated Builders and Contractors' Construction Backlog Indicator increased to 9.2 months in November, according to an ABC member survey conducted Nov. 21 to Dec. 6. The reading is 0.8 months higher than in November 2021.

The CBI is now at its highest level since the second quarter of 2019. The increase in backlog observed in November is largely attributed to contractors with under $30 million in revenue, which now have their highest level of backlog in over three years.

Contractors' backlog of work reaches three-year high

“The rise in backlog is remarkable and unexpected,” said ABC Chief Economist Anirban Basu. “A number of contractors have been reporting that their backlog has risen rapidly over the past three months, which is counterintuitive given the pervasive view that the broader economy is headed into recession.

“The improvement in backlog was particularly sharp in the commercial and institutional category, and health care-related construction has emerged as a major driver of new activity,” added Basu. “While it seems unlikely that backlog will hold up in the face of the Federal Reserve’s efforts to slow demand, many predicted that backlog would have dipped by now and that has yet to transpire. What’s more, many contractors expect sales and staffing levels to climb over the next six months, while profit margins are projected to remain stable.”

Related Stories

Senior Living Design | May 9, 2017

Designing for a future of limited mobility

There is an accessibility challenge facing the U.S. An estimated 1 in 5 people will be aged 65 or older by 2040.

Industry Research | May 4, 2017

How your AEC firm can go from the shortlist to winning new business

Here are four key lessons to help you close more business.

Engineers | May 3, 2017

At first buoyed by Trump election, U.S. engineers now less optimistic about markets, new survey shows

The first quarter 2017 (Q1/17) of ACEC’s Engineering Business Index (EBI) dipped slightly (0.5 points) to 66.0.

Market Data | May 2, 2017

Nonresidential Spending loses steam after strong start to year

Spending in the segment totaled $708.6 billion on a seasonally adjusted, annualized basis.

Market Data | May 1, 2017

Nonresidential Fixed Investment surges despite sluggish economic in first quarter

Real gross domestic product (GDP) expanded 0.7 percent on a seasonally adjusted annualized rate during the first three months of the year.

Industry Research | Apr 28, 2017

A/E Industry lacks planning, but still spending large on hiring

The average 200-person A/E Firm is spending $200,000 on hiring, and not budgeting at all.

Market Data | Apr 19, 2017

Architecture Billings Index continues to strengthen

Balanced growth results in billings gains in all regions.

Market Data | Apr 13, 2017

2016’s top 10 states for commercial development

Three new states creep into the top 10 while first and second place remain unchanged.

Market Data | Apr 6, 2017

Architecture marketing: 5 tools to measure success

We’ve identified five architecture marketing tools that will help your firm evaluate if it’s on the track to more leads, higher growth, and broader brand visibility.

Market Data | Apr 3, 2017

Public nonresidential construction spending rebounds; overall spending unchanged in February

The segment totaled $701.9 billion on a seasonally adjusted annualized rate for the month, marking the seventh consecutive month in which nonresidential spending sat above the $700 billion threshold.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021