flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

COVID-19 public health guidelines may be downplaying building systems solutions

Codes and Standards

COVID-19 public health guidelines may be downplaying building systems solutions

Emphasis on cleaning surfaces overlooks importance of mechanical infrastructure.


By Peter Fabris, Contributing Editor | July 1, 2020

Courtesy Pixabay

As scientists learn more about the COVID-19 virus, opinions are changing on how it is spread from person to person, and that has implications for how to reopen buildings safely.

Emphasis to date on protocols for reopening buildings has focused on surface cleaning and occupant density. But, if as some scientists suspect, the virus can live for at least three hours in aerosols—tiny particles that can be carried through the air for long distances—HVAC systems could play a key role in spreading the virus. There are opposing views on whether aerosols actually can transmit the virus, but if they do, then ventilation systems could spread the virus through unfiltered re-circulation of indoor air.

In April, ASHRAE addressed the issue of possible aerosol transmission with recommendations that include:

· Maintain a relative humidity of 40% to 60% inside buildings instead of the usual 20% to 40%.

· Install air filters rated at least at MERV-13.

· Minimize re-circulation of indoor air, and bring in outside air either by mechanical means or by opening windows.

The humidity recommendation was made because higher humidity makes aerosols heavier, causing them to drop to the floor faster. ASHRAE has also recommended that the intake of outside air be set to the highest level permitted by the mechanical equipment. Some specialists recommend a full re-commissioning process for reopening buildings.

Related Stories

| Jul 19, 2012

NRCA: Roofing insulation performance, local climate keys to computing R-value

To minimize the loss of thermal resistance in design, the R-value of roof insulation should be computed based on the actual performance of the insulation material and the local climate, says the National Roofing Contractors Association.

| Jul 16, 2012

Business school goes for maximum vision, transparency, and safety with fire rated glass

Architects were able to create a 2-hour exit enclosure/stairwell that provided vision and maximum fire safety using fire rated glazing that seamlessly matched the look of other non-rated glazing systems.

| Jul 12, 2012

Federal budget chief to explain impact of pending defense cuts before Congress

Office of Management and Budget Director Jeffrey Zients is scheduled to testify before the House Armed Services Committee Aug. 1 to explain the possible effects of $500 billion in defense cuts on U.S. companies, including those in the design and construction industry.

| Jul 12, 2012

Pennsylvania legislature moves to prevent undocumented workers on public construction projects

Legislation to prevent undocumented workers from being hired by construction companies working on state-funded projects passed the Pennsylvania Legislature.

| Jul 12, 2012

New York’s One Bryant Park Bank of America tower is first new high-rise to achieve LEED Platinum

The new One Bryant Park Bank of America tower in midtown Manhattan is the first new commercial high-rise to achieve LEED Platinum certification.

| Jul 12, 2012

OSHA launches campaign to prevent heat illness

The Occupational Safety and Health Administration has launched its 2012 Heat Illness Prevention Campaign to educate employees and their employers about the hazards of working outdoors in heat, and how to prevent heat-related illnesses.

| Jul 12, 2012

Contractors have increasing concerns over new federal hiring quotas

A proposed rule by the U.S. Department of Labor's Office of Federal Contract Compliance Programs to increase disabled- and veteran-worker hiring quotas for federal contractors continues to raise deep concerns among contractors.

| Jul 5, 2012

Veterans Administration threatens to pull contract on new Orlando medical center

The Veterans Administration asked contractor Brasfield & Gorrie to get more workers on the job and figure out a way to get the job done faster, or the VA would pull the contract on the much-delayed Orlando VA Medical Center.

| Jul 5, 2012

Cost to contractors for new federal hiring quotas much higher than estimated, AGC says

Administration officials significantly underestimated the cost to construction employers of proposed new hiring quotas for federal contractors, according to analysis by the Associated General Contractors of America.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021