Headquarters will house office, spaces for private education company in Massachusetts
Phase one of the 10-story, 300,000-sf headquarters for EF Education First, a Cambridge, Mass.-based private education company, is under way. Designed by Wingardh Arkitektkontor AB of Sweden and Wilson Architects, the facility will provide 230,000 sf of office and educational space, a 65,000-sf parking garage, a 14,000-sf restaurant, and 31,000 sf of ground- and mezzanine-level public space. In a design-build partnership, Skanska USA Building will serve as contractor, while TG Gallagher will provide HVAC, plumbing, and fire protection services.
[pagebreak]
Multi-phase project will lead to new MSU Denver athletic complex
Six men’s and women’s sports teams at the Metropolitan State University of Denver will soon have a new $12 million athletic complex to call home. The three-phase project will span 12.5 acres. Saunders Construction will lead construction, breaking ground on eight tennis courts in January, with expected completion by April. Phase two will include construction of baseball and soccer fields; phase three will complete a new softball field and locker rooms. The Building Team also includes Davis (design), CTL Thompson (engineering), and the Farnsworth Group (environmental).
[pagebreak]
Nature preserve center seeks to protect resources, educate community
Orlando-based design team leader Bellomo-Herbert, a GAI Company, hired VOA Associates to provide architectural services for the Long Creek Nature Preserve Center educational facility in Palm Coast, Fla. Located on a 9.3-acre site, this 7,000-sf education center is part of a larger project that includes boardwalks, crushed shell nature trails, pavilions, a fishing pier, public restrooms, and parking. Signage along the trails will provide information about plant species and environmental topics. The project is part of an initiative to protect natural resources and provide recreational opportunities along the waterway.
[pagebreak]
Tucson high-rise targets U of Arizona luxury student housing market
Construction is set to begin in early 2013 on Park Avenue, a new student housing project located next to the University of Arizona, in Tucson. Campus Acquisitions is the developer of the 166-unit building designed by Shepley Bulfinch that will house 386 students. Beal|Derkenne Construction expects to complete the project by July 2014. +
Related Stories
Cultural Facilities | Feb 25, 2015
Bjarke Ingels designs geodesic dome for energy production, community use
A new building in Uppsala, Sweden, will serve as a power plant during the winter and a venue for shows, festivals, and music events during the warm months.
Cultural Facilities | Feb 25, 2015
Edmonton considering 'freezeway' to embrace winter
If the new Edmonton Freezeway is constructed, residents will have an 11-km course that winds through the city and allows them to skate to work, school, and other city activities.
Mixed-Use | Feb 11, 2015
Developer plans to turn Eero Saarinen's Bell Labs HQ into New Urbanist town center
Designed by Eero Saarinen in the late 1950s, the two-million-sf, steel-and-glass building was one of the best-funded and successful corporate research laboratories in the world.
| Oct 28, 2014
Miami accepts more modest plan to renovate its convention center
The city of Miami has awarded an $11 million contract for its on-again, off-again convention center renovation to Denver-based Fentress Architects, which will serve as the design criteria professional on this project.
| Aug 14, 2014
Museum of Mayan Culture draws inspiration from temple design [slideshow]
The Museo Maya de América in Guatemala City will be the world’s largest museum of Mayan history and culture, at 60,000 sf.
| Aug 4, 2014
Facebook’s prefab data center concept aims to slash construction time in half
Less than a year after opening its ultra-green, hydropowered data center facility in Luleå, Sweden, Facebook is back at it in Mother Svea with yet another novel approach to data center design.
| Mar 25, 2014
Sydney breaks ground on its version of the High Line elevated park [slideshow]
The 500-meter-long park will feature bike paths, study pods, and outdoor workspaces.
| Jan 30, 2014
See how architects at NBBJ are using computational design to calculate the best views on projects [video]
In an ideal world, every office employee would have a beautiful view from his or her desk. While no one can make that happen in real life, computational design can help architects maximize views from every angle.
| Jan 29, 2014
Notre Dame to expand football stadium in largest project in school history
The $400 million Campus Crossroads Project will add more than 750,000 sf of academic, student life, and athletic space in three new buildings attached to the school's iconic football stadium.
| Jan 28, 2014
2014 predictions for skyscraper construction: More twisting towers, mega-tall projects, and 'superslim' designs
Experts from the Council on Tall Buildings and Urban Habitat release their 2014 construction forecast for the worldwide high-rise industry.