flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Dept. of Energy releases decision guides for plug and process loads

Codes and Standards

Dept. of Energy releases decision guides for plug and process loads

Plug and process loads consume about 30% of the primary energy in U.S. commercial buildings today.


By Peter Fabris, Contributing Editor | January 25, 2016
Dept. of Energy releases decision guides for plug and process loads

Photo: Steven Martin/Creative Commons

The Department of Energy has released a document with decision guides for plug and process loads in commercial buildings.

Plug and process loads (PPLs) consume about 30% of the primary energy in U.S. commercial buildings today, the department says. That figure is expected to rise to 35% by 2025.

The decision guides were created to help building owners find the right control strategy for PPLs in their buildings. The guides are targeted for different building types, and outline the costs, potential savings, complexities, and user-friendliness of various control strategies and their applications to each building type. 

The guides can also help building owners determine whether a control is appropriate for particular project applications such as staged retrofit projects, whole-building retrofits, new construction projects, and projects that involve tenants and landlords. The document also provides links to additional resources that can further help building owners assess and reduce the energy use that is associated with PPLs, find rebates for PPL control measures, and procure the right control types for building equipment.

Tags

boombox1
boombox2
native1

More In Category

Engineers

Navigating battery energy storage augmentation

By implementing an augmentation plan upfront, owners can minimize potential delays and unforeseen costs when augmentation needs to occur, according to Burns & McDonnell energy storage technology manager Joshua Crawford.


Sustainable Design and Construction

Northglenn, a Denver suburb, opens a net zero, all-electric city hall with a mass timber structure

Northglenn, Colo., a Denver suburb, has opened the new Northglenn City Hall—a net zero, fully electric building with a mass timber structure. The 32,600-sf, $33.7 million building houses 60 city staffers. Designed by Anderson Mason Dale Architects, Northglenn City Hall is set to become the first municipal building in Colorado, and one of the first in the country, to achieve the Core certification: a green building rating system overseen by the International Living Future Institute.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021

Â