flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Developers confirm Renzo Piano’s contribution in Sydney harbor overhaul

High-rise Construction

Developers confirm Renzo Piano’s contribution in Sydney harbor overhaul

If the entire development is approved, One Sydney Harbour will be Piano’s second project in Australia.


By BD+C Staff | March 12, 2015
Developers confirm Renzo Piano’s contribution in Sydney harbor overhaul

Based on information from an animated preview of the master plan, Renzo Piano's residential towers are the second and third ones from the left.

Italian architect Renzo Piano has designed a pair of residential high-rises for Sydney’s $4.5 billion rejuvenation project, Dezeen reports.

These two skyscrapers, named One Sydney Harbour, were the final contributions to the site master plan confirmed by developer Lend Lease. Other architects who’s designs may be used for the waterfront complex are Rogers Stirk Harbour + Partners and Wilkinson Eyre. The plans have now been submitted to the New South Wales planning department for approval.

If the entire development is approved, One Sydney Harbour will be Piano’s second project in Australia, after the mixed-use Aurora Place complex completed next to Sydney’s Royal Botanic Gardens in 200.

Read more about the harbor overhaul project at Dezeen.

 

Related Stories

Green | Feb 3, 2017

Nanjing Green Towers will be Asia’s first vertical forest

The project will be covered in 1,100 trees and 2,500 cascading plants and shrubs.

Reconstruction & Renovation | Feb 2, 2017

$500 million investment will modernize Chicago’s Willis Tower *Updated*

The project will be the first major renovation in the building’s 43-year history.

High-rise Construction | Feb 1, 2017

Rippled tower from CORE will be first of 10-tower master plan in Mississauga, Ont.

The tower will become the tallest building in what is Canada’s 6th largest city.

High-rise Construction | Jan 31, 2017

Chicago’s West Loop to receive 500-foot apartment tower

The 44-story tower will provide 492 rental units and a retail podium.

High-rise Construction | Jan 27, 2017

Silverstein Properties waffles on what to do with Far West Side property

The company has gone from a two-tower design, to a supertall, and now, supposedly, back to a two-tower design.

High-rise Construction | Jan 26, 2017

Paris tower provides office space and three hotel complexes across its three superimposed volumes

Equipped with hanging gardens and a panoramic viewpoint for its top tier, Jardins de l’Arche Tower will rise in Paris’s La défense business district.

Architects | Jan 24, 2017

Politicians use architectural renderings in bid to sell Chicago’s Thompson Center

The renderings are meant to show the potential of the site located in the heart of the Chicago Loop.

High-rise Construction | Jan 23, 2017

Growth spurt: A record-breaking 128 buildings of 200 meters or taller were completed in 2016

This marks the third consecutive record-breaking year for building completions over 200 meters.

High-rise Construction | Jan 20, 2017

CTBUH’s tall building predictions for 2017

Woodscrapers, the automobile industry's expansion into the tall building development business, and Nairobi's climb toward becoming Africa's skyscraper hub are just a few of the topics CTBUH's 2017 tall building predictions report focuses on.

High-rise Construction | Jan 19, 2017

Goettsch Partners to design Shenzhen-based headquarters complex

The Chicago architecture firm won a design competition for the project anticipated to be completed in 2019.

boombox1
boombox2
native1

More In Category




Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021