flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Duke’s new Chinese campus sits atop a manmade lake

University Buildings

Duke’s new Chinese campus sits atop a manmade lake

Gensler and LandDesign designed the project.


By David Malone, Associate Editor | July 3, 2019

All images courtesy LandDesign

As part of Duke University’s 200-acre global campus in Kunshan, China, the 30-acre first phase of Duke Kunshan University Campus includes five buildings that sit atop a manmade lake and are interconnected by low bridges and seasonal plazas.

The plazas are submerged underneath the water and are only revealed and usable during periods of low rainfall, which coincides with peak student attendance. A four-acre water ecosystem is the central landscape element of the new campus and includes a stormwater management system with point-source water filtration, roof gardens, rain gardens, living water gardens, greywater capture, and aquatic habitat creation.

 

 

"The entire water filtration system serves as an ecological education lab with a flowing water garden located at the end,” said Kevin Vogel, PE, Partner and Civil Engineer with LandDesign, in a release. "The design also addresses scalable energy alternatives to correspond with the American College & University President’s Climate Commitment for carbon neutrality.”

Primary gathering spaces feature movable benches, planters, and sculptures in order to accommodate large events, art installations, and social/learning space. Gensler is the project’s architect while LandDesign is handling landscape architecture and civil engineering duties.

 

 

Related Stories

Game Changers | Jan 12, 2018

‘Kit of parts’ anchors university’s remake

Sasaki designs interchangeable spaces to support a major educational shift at Mexico’s largest university system.

Education Facilities | Jan 8, 2018

Three former school buildings are repurposed to create mini-campus for teacher education

The $25.3 million project is currently under construction on the Winona State University campus.

Healthcare Facilities | Jan 6, 2018

A new precision dental center embodies Columbia University’s latest direction for oral medicine education

The facility, which nests at “the core” of the university’s Medical Center, relies heavily on technology and big data. 

Big Data | Jan 5, 2018

In the age of data-driven design, has POE’s time finally come?

At a time when research- and data-based methods are playing a larger role in architecture, there remains a surprisingly scant amount of post-occupancy research. But that’s starting to change.

Mixed-Use | Jan 5, 2018

USC Village is the largest development in the history of the University of Southern California

USC Village comprises six buildings and 1.25 million sf.

Adaptive Reuse | Jan 4, 2018

Student housing development on Chapman University campus includes adaptive reuse of 1918 packing house

The Packing House was originally built for the Santiago Orange Growers Association.

University Buildings | Dec 20, 2017

New residence hall to house 500 students at Duke University

The project was designed by William Rawn Architects and will be built by Skanska.

University Buildings | Dec 4, 2017

The University of Nebraska’s new College of Business building highlights entrepreneur alumni and corporate leaders

Numerous storytelling spaces and displays are located throughout the building.

Wood | Nov 30, 2017

The first large-scale mass timber residence hall in the U.S. is under construction at the University of Arkansas

Leers Weinzapfel Associates, Modus Studio, Mackey Mitchell Architects, and OLIN collaborated on the design.

boombox1
boombox2
native1

More In Category

Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021