ECC, headquartered in California and with offices nationwide and worldwide, has been awarded a design-build construction task order under their AFCEE HERC for the Medical Education Training Complex (METC) Medical Instructional Facilities (MIF) Building 3 and Building 4 at Fort Sam Houston in San Antonio, TX. ECC was selected as one of only three contractors during Phase 1 and successfully developed the $116-million Phase 2 proposal with design and HERC team member Burns and McDonnell. This is one of the largest CONUS construction projects awarded by AFCEE.
ECC Awarded AFCEE Design-Build Task Order