Arising tower by tower in a former waterfront railway yard, CityPlace remade Toronto’s skyline with its collection of new high-rise towers, and became home to over 20,000 residents. This community of Torontonians pioneering vertical living are not just young singles and “empty nesters,” but also families.
Recognizing a vital need for a missing social and educational nexus in Toronto’s booming downtown core, the new Canoe Landing Campus by ZAS Architects will house a 158,893-sf, $65 million community recreation center, public and Catholic elementary schools, and a childcare center within one campus.
Serving an important social function, the campus architecture supports a new platform for connection. In a vertical, urban community where neighbors often experience solitary lifestyles, this interaction is vital. Conceived as a social condenser, the building program was developed through multiple community meetings attended by hundreds of residents.
From the first public meeting packed with strollers and young families, it was clear this community had very unique needs resulting from a wide demographic range, the realities of living with less square footage, and the pressures on existing public space as the population grew with each new tower constructed. Faced with the challenges presented, ZAS Architects created an original architectural form that leveraged the synergies of co-locating the schools, community center, and childcare to reduce the building footprint and maximize open space.
The new campus provides an opportunity for shared community spaces, from gardening plots to basketball courts on the roof, spaces for indoor and outdoor play, a community kitchen for canning parties and cooking classes, and a gracious lobby space for neighbors to meet.
Community input generated innovative spaces such as indoor play areas geared to enhancing children’s motor skills and the creation of multipurpose rooms that adapt to both active and passive uses.
The two schools share indoor play spaces, a learning commons, gymnasium, and educational areas. The outdoor park and community rooms are accessible by all. A flexible design solution features two- and three-story buildings that anchor the east side of the park. C-shaped planning maximizes solar access while sheltering play areas from the adjacent expressway.
Bisected by a pedestrian corridor, the building connects through an elevated bridge forming an east-west gateway. One side of this link contains the community centre, with gymnasium and fitness center.
Sustainability and resiliency are prominently integrated, including maximizing green roof opportunities and an introduction of photovoltaic panels to generate 10% renewable energy to meet the highest level of the City of Toronto Green Standards. Above, the building features a dynamic, “active” green roof, complete with a basketball court, jogging track, and urban gardens.
The clients on the project are the City of Toronto & Childrens Services, Toronto District School Board, and Toronto Catholic District School Board.
Related Stories
Multifamily Housing | Aug 10, 2021
A long-gestating apartment building finally gets underway in Long Beach, Calif.
Broadstone Promenade will add another piece to the city’s downtown lifestyle.
Multifamily Housing | Aug 9, 2021
Eden House residential development will rise 16 stories in Nashville
Gresham Smith designed the project.
| Aug 8, 2021
Furniture installation lends a 'hospitality feel' to a new apartment community in Colorado Springs
Furniture Solutions Group procured the furniture, window treatments, artwork, and accessories for the Mae on Cascade apartments in Colorado Springs.
Multifamily Housing | Aug 1, 2021
An aging public housing complex in L.A. is being redeveloped
The city and county are grappling with an escalating homeless crisis
Multifamily Housing | Jul 30, 2021
Multifamily housing for a post-COVID world
A trio of multifamily design experts presents concepts for post-pandemic apartment developments.
Multifamily Housing | Jul 28, 2021
158-unit multifamily complex set to begin construction in D.C.’s Logan Circle
Hickok Cole is the project architect.
Multifamily Housing | Jul 28, 2021
158-unit multifamily complex set to begin construction in D.C.’s Logan Circle
Hickok Cole is the project architect.
Multifamily Housing | Jul 27, 2021
New report predicts double-digit multifamily delivery rebound in 2021
Yardi Matrix also foresees rent inflation “persisting” in some metros for months ahead.
Multifamily Housing | Jul 27, 2021
Call for submissions: ‘Affordable Housing Projects' Cover Story
MULTIFAMILY Design+Construction is looking for the best new "affordable housing" communities for the Fall Issue 2021.
Multifamily Housing | Jul 23, 2021
26-story apartment tower tops out in Silver Spring, Md.
The building will be the tallest in Silver Spring.