flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Elevator shafts a major source of heat loss in New York City

Codes and Standards

Elevator shafts a major source of heat loss in New York City

A typical New York apartment building loses thousands of dollars worth of energy every year from leaky elevator shafts that vent warm air at the top of the building and draw in cold air at the bottom, according to a new Urban Green Council report.


By Peter Fabris, Contributing Editor | March 29, 2015
Elevator shafts a major source of heat loss in New York City

The report, “Spending Through the Roof,” says that apartment building owners pay an average of $3,400 a year to replace heat lost through the roof. In taller buildings, the cost can be more than $20,000 a year. Illustration: Urban Green Council 

New York City should focus on elevator shafts to improve the energy efficiency standards of its high-rise residences, according to a new report from the Urban Green Council.

A typical New York apartment building loses thousands of dollars worth of energy every year from leaky elevator shafts that vent warm air at the top of the building and draw in cold air at the bottom.

The report, “Spending Through the Roof says that apartment building owners pay an average of $3,400 a year to replace heat lost through the roof. In taller buildings, the cost can be more than $20,000 a year.

Plugging this type of air leak can cost from $500 to $15,000. If the leaks were plugged on 4,000 tall apartment buildings in the city, landlords would collectively save $11 million a year, while keeping 30,000 metric tons of greenhouse gases out of the atmosphere.

Elevator shafts and stairwell openings were required to vent smoke in the case of fire. But construction practices and firefighting techniques have changed, so the vents now "are needlessly open all the time."

Codes governing stairwell vents haven't changed since 1929 so there's no legal way now for building owners to fix the problem. 

Tags

Related Stories

Codes and Standards | Nov 29, 2021

FAA seeking design of air traffic control towers of the future

Call for design submissions for safe, efficient structures.

Codes and Standards | Nov 28, 2021

Efficient electric water heaters in multifamily buildings significantly reduce carbon emissions

In buildings with 5+ units, water heating uses more energy than space heating, cooling, or lighting.

Codes and Standards | Nov 23, 2021

New York’s Labor Law Section 240 and how it affects general contractors

The ‘Scaffold Law’ was first enacted by the New York State Legislature in 1885 and is one of the single most-used laws in construction accident cases.

Codes and Standards | Nov 22, 2021

ABC’s Construction Technology Report finds focus on solving operational problems

More than half rely on project management software.

Codes and Standards | Nov 22, 2021

Contractors say 811 utility location system has significant flaws

More than half of firms in survey report damages, near misses because lines were unmarked or marked incorrectly.

Codes and Standards | Nov 19, 2021

Creating net-zero/net-positive buildings is top priority in Green Building Trends 2021 report

Findings also demonstrate compelling business case for building green.

Codes and Standards | Nov 19, 2021

Construction Startup Competition 2021 awards highlight tech innovations

AI-powered software to identify and explain critical issues in construction contracts takes top prize.

Codes and Standards | Nov 18, 2021

Infrastructure bill contains $5 billion for energy efficiency in buildings

Wide range of programs to reduce energy use, improve materials, train workers.

Codes and Standards | Nov 17, 2021

Skanska will provide embodied carbon assessments on all new projects over 53,000 sf

Will use the Embodied Carbon in Construction Calculator it helped create.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021