flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Eleven, Minneapolis’ tallest condo tower, breaks ground

Multifamily Housing

Eleven, Minneapolis’ tallest condo tower, breaks ground

RAMSA designed the project.


By David Malone, Associate Editor | October 14, 2019
Eleven multifamily development top tier

All renderings: Paperfarm

Rising 550 feet into the Minneapolis sky, Eleven will become the tallest condominium tower in the city.

The 41-story building recently broke ground in the Mill District and will include 118 residences (including 17 penthouses). The building will primarily have four units per floor, transitioning to two units per floor as the building rises and, finally, one unit per floor at the top. Each unit will include a private terrace measuring 14 by 14 feet.

 

Eleven multifamily tower in the Minneapolis skyline

 

Among the 145,652-sf building’s ample selection of amenities are a large landscaped terrace, a 75-foot lap pool, a private motor court, a 24/7 doorman, a large fitness suite, a multi-sport court, a library, a golf simulator, a children’s splash pad, restaurant space, a demonstration kitchen with dining, residential and guest parking, and storage.

 

See Also: A giant shipwreck sculpture highlights the proposal for Prague’s tallest building

 

Homes in Eleven will start at $900,000. Luigi Bernardi of Arcadia LLC is serving as the project sponsor and co-developer and Ryan Companies is serving as co-developer, builder and is partnering with RAMSA as the architect.

 

Eleven rooftop terrace

Related Stories

| Feb 5, 2013

8 eye-popping wood building projects

From 100-foot roof spans to novel reclaimed wood installations, the winners of the 2013 National Wood Design Awards push the envelope in wood design.

| Jan 31, 2013

Map of U.S. illustrates planning times for commercial construction

Stephen Oliner, a UCLA professor doing research for the Federal Reserve Board, has made the first-ever estimate of planning times for commercial construction across the United States.

| Jan 31, 2013

More severe wind storms should prompt nationwide reexamination of building codes, says insurance expert

The increased number and severity of storms with high winds nationally should prompt a reexamination of building codes in every community, says Mory Katz, vice president, Verisk Insurance Solutions Commercial Property, Jersey City, N.J.

| Jan 29, 2013

Trinitas and Harrison Street Break Ground Near University of Kentucky

The 699-bed Collegiate on Angliana, with an anticipated opening date of August 2013, will serve students attending the University of Kentucky (UK).

| Jan 23, 2013

Music-Inspired Apartment Complex Completed in Tampa's Tempo District

Named in honor of jazz artist Ella Fitzgerald, Ella at Encore is the first building to rise from plans to develop a mixed-use, mixed-income urban village in the community.

| Dec 6, 2012

Suffolk Construction awarded Phase Two of Boston’s Old Colony redevelopment project

Project team breaks ground on South Boston public housing project designed for energy efficiency.

| Nov 13, 2012

2012 LEED for Homes Award recipients announced

USGBC recognizes excellence in the green residential building community at its Greenbuild Conference & Expo in San Francisco

| Nov 11, 2012

Greenbuild 2012 Report: Multifamily

Sustainably designed apartments are apples of developers’ eyes

| Oct 5, 2012

2012 Reconstruction Award Silver Winner: 220 Water Street, Brooklyn, N.Y.

The recent rehabilitation of 220 Water Street transforms it from a vacant manufacturing facility to a 134-unit luxury apartment building in Brooklyn’s DUMBO neighborhood.

| Aug 1, 2012

C.W. Driver forms Driver URBAN

Driver URBAN specializes in the construction of multi-family apartments, mixed-use developments, affordable housing, student and senior housing, and hospitality projects.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021