flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

EPA releases WaterSense draft specification for flushometer-valve toilets

EPA releases WaterSense draft specification for flushometer-valve toilets

Expected to save more than 5,400 gallons per year


December 23, 2014

The U.S. Environmental Protection Agency's WaterSense program has released a draft specification for water-efficient flushometer-valve toilets. After the specification is finalized, EPA anticipates that each WaterSense labeled flushometer-valve toilet model will have the potential to save more than 5,400 gallons of water per year. That translates into more than $1,000 savings over the lifetime of the toilet.

Flushometer-valve toilets are typically found in commercial, institutional, or industrial restrooms. These types of toilets have two main components—the toilet bowl and the flushometer valve.

Like all WaterSense labeled products, flushometer-valve toilets will be independently certified. EPA's draft specification sets the maximum flush volume for WaterSense labeled flushometer-valve models at 1.28 gallons per flush (gpf), which is 20% less water than the federal standard.

EPA estimates that about 28%, or 7.6 million, of the 27 million flushometer-valve toilets currently installed across the country flush at volumes higher than the federal standard of 1.6 gpf—some as much as 3 to 7 gpf. If all old, inefficient commercial flushometer-valve toilets were replaced with WaterSense labeled models, it would save more than 41 billion gallons of water per year nationwide, EPA estimates.

(http://www.epa.gov/watersense/products/flushometer-valve-toilets.html)

Related Stories

| Aug 30, 2012

OSHA plans new crane-safety standards for demolition and underground work

The new rule will streamline OSHA’s standards by eliminating the separate cranes and derricks standard currently used for underground and demolition work.

| Aug 30, 2012

Federal government cancels defense contracts worth $2.15 billion

This action may foreshadow federal spending cuts scheduled for year's end if Congress takes no action on the federal budget.

| Aug 30, 2012

Public comment period is open for CRRC-1 standard

The CRRC-1 standard covers specimen preparation and test methods for measuring the initial and aged solar reflectance and thermal emittance of roofing products.

| Aug 30, 2012

LEED system's footprint reaches 2 billion sf, with 7 billion sf in the pipeline

About 7 billion more sf of commercial space is expected in the pipeline.

| Aug 30, 2012

Georgia drops LEED wood source standard on state projects

Currently, LEED green building standards only accept timber products certified by the Forest Stewardship Council (FSC).

| Aug 21, 2012

AGC offers second edition of the Federal Government Contractor: Ethics & Compliance Programs manual

This publication helps contractors appreciate the grounds for an alleged violation of the expected standards of business conduct and ethics, and to develop, implement, and document an effective ethics and compliance program.

| Aug 21, 2012

Federal Safe Building Code Incentive Act’s bipartisan support, no notable objection, bodes well for passage

The Safe Building Code Incentive Act would give states a little extra post-disaster federal funding if they enacted and enforced nationally recognized building codes for businesses and residences before disaster strikes.

| Aug 16, 2012

New York’s Barclays Center project accused of ignoring noise, pollution regulations

Construction crews racing to finish the Brooklyn Barclays Center are ignoring strict regulations to reduce noise and pollution, a new report by critics has found.

| Aug 16, 2012

Harness saves life of worker cleaning Washington state Capitol

Fall-protection equipment helped save the life of a worker who was cleaning the Washington state Capitol building in Olympia, after the platform he was using gave way.

| Aug 16, 2012

CSI webinar on August 21 focuses on electronic energy control

The Construction Specifications Institute (CSI) is sponsoring a free webinar on August 21 at 2:00 p.m. (EDT) on electronic energy control.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021