flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Facebook plans to build two more Frank Gehry-designed offices

Office Buildings

Facebook plans to build two more Frank Gehry-designed offices

In addition to office space, Facebook’s development involves a bridge for pedestrians and cyclists.


By BD+C Staff | April 8, 2015
Facebook plans to build two more Frank Gehry-designed offices

An early model of the recently opened building sitting inside the actual building. Photo courtesy Facebook.

With the hopes of turning industrial Menlo Park, Calif., into a vibrant hub of ideas, Facebook submitted plans to construct two additional offices on 58 acres of land it purchased last year, The Los Angeles Times reports.

The company’s submission came the same week its employees moved into a new Frank Gehry-designed building that features a massive green roof. 

According to the Times, the two buildings were also designed by Gehry, and the additions will give the company 985,719 of office and green space built with a similar look, feel, and height to the recently opened one.

To make way for these new buildings, nine buildings on the site would need to be demolished.

The Los Angeles Times has the full report.

Related Stories

Office Buildings | Jul 17, 2018

Transwestern report: Office buildings near transit earn 65% higher lease rates

Analysis of 15 major metros shows the average rent in central business districts was $43.48/sf for transit-accessible buildings versus $26.01/sf for car-dependent buildings.

Office Buildings | Jun 18, 2018

Cube-shaped AmorePacific headquarters building completes construction in Seoul

The David Chipperfield Architects-designed project began in 2010.

Office Buildings | Jun 15, 2018

Portland’s newest office buildings put nature on center stage

Hacker Architects designed the space for Portland’s Frontside District.

Office Buildings | Jun 11, 2018

Online travel company moves to the 66th floor of the Empire State Building

The new headquarters includes almost 20,000 sf of additional space.

Office Buildings | Jun 6, 2018

Final Cut: Jupiter Entertainment’s new production studio in New York combines office and editing spaces

The project team completed this full-floor renovation in four months.

Office Buildings | May 31, 2018

EarthCam Headquarters features a 25-foot-tall video portal entrance

Watch a time-lapse of the HQ being built from groundbreaking to grand opening.

| May 30, 2018

Accelerate Live! talk: T3 mass timber office buildings

In this 15-minute talk at BD+C’s Accelerate Live! conference (May 10, 2018, Chicago), architect and mass timber design expert Steve Cavanaugh tells the story behind the nation’s newest—and largest—mass timber building: T3 in Minneapolis.

| May 24, 2018

Accelerate Live! talk: Security and the built environment: Insights from an embassy designer

In this 15-minute talk at BD+C’s Accelerate Live! conference (May 10, 2018, Chicago), embassy designer Tom Jacobs explores ways that provide the needed protection while keeping intact the representational and inspirational qualities of a design.

boombox1
boombox2
native1

More In Category



Sustainable Design and Construction

Northglenn, a Denver suburb, opens a net zero, all-electric city hall with a mass timber structure

Northglenn, Colo., a Denver suburb, has opened the new Northglenn City Hall—a net zero, fully electric building with a mass timber structure. The 32,600-sf, $33.7 million building houses 60 city staffers. Designed by Anderson Mason Dale Architects, Northglenn City Hall is set to become the first municipal building in Colorado, and one of the first in the country, to achieve the Core certification: a green building rating system overseen by the International Living Future Institute.


MFPRO+ News

San Francisco unveils guidelines to streamline office-to-residential conversions

The San Francisco Department of Building Inspection announced a series of new building code guidelines clarifying adaptive reuse code provisions and exceptions for converting office-to-residential buildings. Developed in response to the Commercial to Residential Adaptive Reuse program established in July 2023, the guidelines aim to increase the viability of converting underutilized office buildings into housing by reducing regulatory barriers in specific zoning districts downtown. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021