flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Federal government shutdown: What it means to AEC firms

Federal government shutdown: What it means to AEC firms

AIA issued a statement and FAQs document following the partial federal government shutdown that began early this morning.


By AIA | October 1, 2013

On behalf of American Institute of Architects' President Mickey Jacob, the organization issued the following statement on the partial federal government shutdown that began early this morning. Along with its statement, AIA published "Shutdown 101: FAQ" to assist its members during the shutdown.

“The AIA is a non-partisan professional association; we work with members of both political parties. And like most Americans, AIA members are extremely disillusioned with the current state of affairs in the nation’s capital.

“The design and construction industry is slowly recovering from one of the worst economic crises in modern history. The last thing we need is the self-inflicted wound that can potentially further damage the economy.

“We urge both political parties to set aside political divisions and put the “common good” of the American public first. That phrase is an anachronism in today’s political vernacular, but lawmakers ought to commit it to memory in coming weeks as the fight over the budget commences and the deadline to address the debt ceiling arrives.

“We urge the public to ask their Congressional to refocus their debate to responsibly and immediately address the federal budget. Above all, we urge the public not to become politically disengaged. That, in part, is why the AIA has posted a comprehensive set of FAQs on our website as a way to measure the impact of the shut-down and to provide AIA members with an opportunity to make sure their voice is heard.”  

About the American Institute of Architects
For over 150 years, members of the American Institute of Architects have worked with each other and their communities to create more valuable, healthy, secure, and sustainable buildings and cityscapes. Members adhere to a code of ethics and professional conduct to ensure the highest standards in professional practice. Embracing their responsibility to serve society, AIA members engage civic and government leaders and the public in helping find needed solutions to pressing issues facing our communities, institutions, nation and world. Visit www.aia.org.

Related Stories

| Sep 12, 2011

LACCD’s $6 billion BIM connection

 The Los Angeles Community College District requires every design-build team in its massive modernization program to use BIM, but what they do with their 3D data after construction is completed may be the most important change to business as usual.

| Sep 12, 2011

Construction waste management

Best practices for an environmentally optimized job site.

| Sep 12, 2011

PVs play new roles as a teaching tool

Solar installations are helping K-12 schools around the country save money and teach students the intricacies of renewable energy sources.

| Sep 12, 2011

Living Buildings: Are AEC Firms up to the Challenge?

Modular Architecture > You’ve done a LEED Gold or two, maybe even a LEED Platinum. But are you and your firm ready to take on the Living Building Challenge? Think twice before you say yes.

| Sep 12, 2011

First phase of plan to revitalize Florida's Hialeah Park announced

This is the first project of a master plan developed to revive the historic racetrack. 

| Sep 12, 2011

Geist opens European branch

The new branch provides the company’s international clients with additional support and services.

| Sep 9, 2011

$22 million investment made in energy efficient building maker

The buildings use at least 25% less energy than the strictest building codes in the U.S., and as much as 80% less energy in certain parts of the country. 

| Sep 9, 2011

Hardinger joins Ryan Companies as vice president, mission critical

He will lead the Ryan team responsible for building and developing data centers and other mission-critical projects, and will oversee business development, client relationships, executive level communications and overall marketing strategies for the division.

| Sep 7, 2011

KSS Architects wins AIA NJ design award

The project was one of three to win the award in the category of Architectural/Non-Residential. 

| Sep 6, 2011

Construction on Beijing's tallest building starts next week

The 108 floor mixed-use skyscraper consists of offices, apartments, hotels and shopping malls on the lower floors.

boombox1
boombox2
native1

More In Category

Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021