flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Fire stops critical to preserving three-decker housing

Codes and Standards

Fire stops critical to preserving three-decker housing

Old multi-family structures continue to provide badly needed homes in urban zones.


By Peter Fabris, Contributing Editor | May 3, 2021

Courtesy Pixabay

Built as working-class housing in the late 19th and early 20th Centuries, the wooden three-story homes still dominate some urban neighborhoods. Though they have fallen out of favor, the structures continue to provide affordable housing in areas badly in need of it.

As decision-makers consider how to preserve these buildings, one of the primary areas of concern is fire safety due to balloon framing construction. Homes built with balloon framing, with long, continuous lumber, offer an unobstructed path for fire to spread quickly from ground level to the attic and roof.

Fire stops between floors can be created in a variety of ways. Insulating foam sealant and nominal lumber like a 2x4 nailed at various distances to break up the balloon framing can help prevent fire from spreading.

Gut renovations can add more fire blocking to break up the exterior walls and retrofit flooring with more fire-resistant materials also helps. Renovations, can be costly, though, going well beyond $100,000 for even basic design changes.

Related Stories

| Apr 19, 2012

Michigan legislature tackling controversial rules on electricians

A fight is brewing in the Michigan legislature over how many fully qualified electricians must be present during electrical work when apprentices also are on hand.

| Apr 19, 2012

Washington city may base building code on rising sea level due to global warming

Aberdeen may become the first city in Washington to base a building code on rising oceans and global warming.

| Apr 19, 2012

CSI webinar on energy codes and building envelopes

This seminar will review recent changes in energy codes, examples of building enclosure wall assemblies for code compliance, potential moisture management and durability challenges, and design tools to assess and minimize potential problems.

| Apr 19, 2012

Innovative plan for storm water in Philadelphia gets EPA’s OK

Philadelphia's $2 billion plan to manage its storm water with green methods including porous pavement, green roofs, and more trees, was officially approved last week by the U.S. Environmental Protection Agency.

| Apr 19, 2012

LEED 2012 to include new credit category for transit-oriented development

The updated LEED 2012 system will introduce a new credit category, “Location and Transportation,” to encourage development oriented around public transit and more walkable communities.

| Apr 17, 2012

FMI report examines federal construction trends

Given the rapid transformations occurring in the federal construction sector, FMI examines the key forces accelerating these changes, as well as their effect on the industry.

| Apr 16, 2012

University of Michigan study seeks to create efficient building design

The result, the researchers say, could be technologies capable of cutting the carbon footprint created by the huge power demands buildings place on the nation’s electrical grid.

| Apr 13, 2012

Congress’s action doesn’t mean Pentagon can’t build LEED gold structures

Though Congress passed a defense budget preventing the Department of Defense from spending money to achieve LEED gold or platinum certification, the Pentagon may still end up constructing buildings to those standards.

| Apr 13, 2012

International Living Building Institute certifies first two Net Zero Energy buildings

A community building in Oregon and an office building in California are the first two projects to earn net-zero status under the International Living Building Institute’s Net Zero Energy Certification program.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021