flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

First phase of Presidium Waterford breaks ground in Austin, Texas

Multifamily Housing

First phase of Presidium Waterford breaks ground in Austin, Texas

O’Brien Architects and Dwell Design Studio are designing the project.


By David Malone, Associate Editor | March 15, 2021
Presidium Waterford exterior

Renderings courtesy Presidium

A new five- and six-story luxury apartment complex, dubbed Presidium Waterford, has broken ground on its first phase in Austin, Texas.

The 281,533-sf residential community will include 283-units in an open building design with plenty of natural light. Each apartment unit will include smart thermostats, smart lighting, and smart touchless unit and amenity entries that can be accessed through a single smartphone app. 

The community will also include environmentally-focused features such as increased insulate properties in the windows and exterior insulation, a 100% rainwater bio filtration system, energy-efficient appliances, and energy-efficient building systems. Innovative sanitation methods will be implemented through state-of-the-art air purification systems and touchless entry doors, faucets, and facility hardware.

 

Presidium waterford

 

Interior common spaces will provide guests and residents multiple cowering office lounges and a gym with spin and yoga studios that connect to the outdoor lawn. A large open-air courtyard with outdoor spaces, a resort-style pool, a water volleyball court, outdoor fireplaces, a fully amenities paseo, a Zen courtyard with fire fits, a shaded hammock grove, and a Bocce court are also included.

The development is located minutes from The Domain, Austin’s “second downtown,” at 183 and Waterford Centre Blvd. The first units are expected to be delivered by Dec. 2022.

Related Stories

| May 2, 2012

Public housing can incorporate sustainable design

Sustainable design achievable without having to add significant cost; owner and residents reap benefits

| Apr 27, 2012

GreenExpo365.com to offer webinars on EPA’s WaterSense Program

Architects and builders interested in developing water-efficient buildings invited to attend free sessions featuring experts discussing water-efficient building practices.

| Apr 19, 2012

KTGY Group’s Arista Uptown Apartments in Broomfield, Colo. completed

First of eight buildings highlights unique amenities.

| Apr 6, 2012

Batson-Cook breaks ground on hotel adjacent to Infantry Museum & Fort Benning

The four-story, 65,000-ft property will feature 102 hotel rooms, including 14 studio suites.

| Mar 27, 2012

Precast concrete used for affordable, sustainable housing in New York

Largest affordable housing development in the nation will provide housing for close to 500,000 people. 

| Mar 19, 2012

Mixed-use project redefines Midtown District in Plantation, Fla.

Stiles Construction is building the residential complex, which is one of Broward County’s first multifamily rental communities designed to achieve LEED certification from the USGBC. 

| Mar 6, 2012

Country’s first Green House home for veterans completed

Residences at VA Danville to provide community-centered housing for military veterans.

| Mar 1, 2012

Reconstruction of L.A.’s Dunbar Hotel underway

Withee Malcolm Architects’ designs for the project include the complete renovation of the Dunbar Hotel and the Somerville Apartments I and II.

| Feb 15, 2012

NAHB sees gradual improvement in multifamily sales for boomers

However, since the conditions of the current overall housing market are limiting their ability to sell their existing homes, this market is not recovering as quickly as might have been expected.

| Feb 10, 2012

Atlanta Housing Authority taps Johnson Controls to improve public housing efficiency

Energy-efficiency program to improve 13 senior residential care facilities and save nearly $18 million.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021