flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

First two affordable family apartment communities open in Irvine’s master planned Great Park Neighborhoods community

Multifamily Housing

First two affordable family apartment communities open in Irvine’s master planned Great Park Neighborhoods community

The buildings offer a total of 166 apartments.


By David Malone, Associate Editor | October 30, 2017
Luminaira affordable apartment housing

Luminaira. Photo courtesy of KTGY Architecture + Planning

The master planned community of Great Park Neighborhoods received its first two affordable family apartment communities for low-income families on Oct. 27.

The Luminaira at Parasol Park and The Espaira at Parasol Park, both designed by KTGY Architecture + Planning, will provide a total of 166 affordable apartments and a 4,000-sf leasing and social services center. The leasing and social services center will include a kitchen, media lounge, computer center, mailroom, and play area. Other amenities will include a pool, barbeque and picnic pavilion, and a dog run. After-school programs and educational classes will also be offered on-site.

Both Luminaira and Espaira will offer two- and three-bedroom floor plans ranging in size from approximately 809 to 1,129 sf. Each unit will come equipped with a gourmet kitchen with an Energy Star refrigerator and dishwasher, solid-surface countertops, hardwood plank-style flooring, ceiling fans, large closets, nine-foot ceilings, some paid utilities, and private outdoor space. A one-car garage is also included with each unit.

 

EspairaEspaira. Photo courtesy of KTGY Architecture + Planning.

 

The modern design focuses on simple, clean lines and an efficient structure and utilizes a neutral color palette. Luminaira was developed by FivePoint Holdings, LLC, Related California, and Riverside Charitable Corporation. Espaira was developed by FivePoint, Related, and ETHIC Housing Trust (El Toro Housing Initiative Collaboration).

Related Stories

| Nov 14, 2011

303 East 33rd Street building achieves LEED-NC

  The 165,000 sf 12-story residential building is the first green development to be LEED certified in the Murray Hill neighborhood of Manhattan.

| Oct 17, 2011

Austin's newest urban apartment complex under construction

Complex sits on a four-acre waterfront site along Lady Bird Lake with spectacular city and lake views, and is slated to open spring 2013.

| Oct 12, 2011

FMI’s Construction Outlook: Third Quarter 2011 Report

  Construction Market Forecast: The general economy is seeing mixed signs.

| Oct 6, 2011

GREENBUILD 2011: NEXT Living EcoSuite showcased

  Tridel teams up with Cisco and Control4 to unveil the future of green condo living in Canada.

| Sep 29, 2011

Kohler supports 2011 Solar Decathlon competition teams

Modular Architecture > In a quest to create the ultimate ‘green’ house, 20 collegiate teams compete in Washington D.C. Mall.

| Sep 23, 2011

$5M pledge renewed for Habitat for Humanity

The five-year commitment, which will run through 2015, includes $5 million of donated interior and exterior locks and keys for homes built with Habitat for Humanity homeowner partners and volunteers.

| Sep 23, 2011

Under 40 Leadership Summit

Building Design+Construction’s Under 40 Leadership Summit takes place October 26-28, 2011 Hotel at the Monteleone in New Orleans. Discounted hotel rate deadline: October 2, 2011.  

| Sep 20, 2011

Jeanne Gang wins MacArthur Fellowship

Jeanne Gang, a 2011 MacArthur Fellowship winner described by the foundation as "an architect challenging the aesthetic and technical possibilities of the art form in a wide range of structures."

| Sep 12, 2011

Living Buildings: Are AEC Firms up to the Challenge?

Modular Architecture > You’ve done a LEED Gold or two, maybe even a LEED Platinum. But are you and your firm ready to take on the Living Building Challenge? Think twice before you say yes.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021