Construction kicked off recently on the Tampa General Health Behavioral Health Hospital, Florida’s first freestanding academic medical behavioral health hospital. The joint venture partnership between Tampa General (a 1,040-bed facility) and Lifepoint Behavioral Health will provide a full range of inpatient and outpatient care in specialized units for pediatrics, adolescents, adults, and geriatrics, and fills a glaring medical need in the area.
The four-story, 83,000-sf hospital will accommodate 96 to 120 inpatient beds. Services for patients with behavioral health issues that are compounded by other medical conditions will be provided in dedicated units.
The hospital will have close ties with Tampa General’s nationally recognized Neuroscience Institute, which provides a wide range of care to patients with neurological disorders. Medical students and resident physicians will receive training from faculty affiliated with University of South Florida (USF) Health Morsani College of Medicine.
“This new hospital will help raise the level of mental health care across the Tampa Bay area,” says Glenn Currier, MD, professor, and chair of the Department of Psychiatry and Behavioral Neuroscience in the USF Health Morsani College of Medicine. “A facility like this, dedicated to patients with behavioral and mental health conditions, especially those experiencing acute crises or complex conditions, will be an incredible asset. This specialized hospital will also ease the burden on area emergency rooms, which take in the bulk of psychiatric emergencies but have few options for the inpatient care that is so critical for successful management of many behavioral and mental health conditions.”
The conditions that will be treated at the facility are complex, but the structural concept is straightforward—a simple concrete foundation with a steel structure. The exterior will be composed of exterior insulation finishing system (EIFS), masonry, metal wall panels, and large curtainwall window systems spanning multiple floors. Materials and colors will complement Tampa General Hospital’s existing network of buildings on the campus and throughout the city. A thin brick/masonry veneer engineered system (MVES) will be installed using pre-fabricated wall panels.
Located in downtown Tampa, adjacent to a new Tampa General Rehabilitation Hospital, TGH Behavioral Health Hospital will bolster Tampa’s burgeoning medical district. The facility is expected to open in late 2024.
The facility was made possible, in part, by funding from the state of Florida to address the state's growing mental health crisis. This past legislative session, Senator Jay Collins and Representative Lawrence McClure secured $10 million in the state budget to support the construction of the TGH Behavioral Health Hospital, according to TGH.
Owner and/or developer: Tampa General Hospital
Design architect: Stengel Hill Architecture
Architect of record: Stengel Hill Architecture
MEP engineer: CMTA, Inc.
Structural engineer: Skyhook Structural Engineering
General contractor/construction manager: JE Dunn Construction
Related Stories
| Mar 21, 2012
Iowa’s Mercy Medical Center’s new Emergency Department constructed using Lean design
New Emergency Department features a "racetrack" design with a central nurses' station encircled by 19 private patient examination rooms and 2 trauma treatment rooms.
| Mar 19, 2012
HKS Selected for Baylor Medical Center at Waxahachie
Baylor Medical Center at Waxahachiewill incorporate advanced technology including telemedicine, digital imaging, remote patient monitoring, electronic medical records and computer patient records.
| Mar 14, 2012
Tsoi/Kobus and Centerbrook to design Jackson Laboratory facility in Farmington, Conn.
Building will house research into personalized, gene-based cancer screening and treatment.
| Mar 6, 2012
Country’s first Green House home for veterans completed
Residences at VA Danville to provide community-centered housing for military veterans.
| Mar 1, 2012
7 keys to ‘Highest value, lowest cost’ for healthcare construction
The healthcare design and construction picture has been muddied by uncertainty over the new healthcare law. Hospital systems are in a bind, not knowing what levels of reimbursement to expect. Building Teams serving this sector will have to work even harder to meet growing client demands.
| Feb 29, 2012
Construction begins on Keller Army Community Hospital addition
The 51,000 square foot addition will become the home for optometry, ophthalmology, physical therapy, and orthopedics clinics, as well as provide TRICARE office space.
| Feb 29, 2012
Shepley Bulfinch selected to design new Children’s Hospital of Buffalo
The firm was selected because of their past experience in designing clinically complex facilities that emphasize patient- and family-centered care and operational efficiency as well as distinctive architectural forms for many other children's and women's hospitals.
| Feb 28, 2012
More than 1,000 have earned EDAC certification since 2009
Milestone achieved as evidence-based design becomes a top 2012 strategy for healthcare organizations.
| Feb 28, 2012
McCarthy completes second phase of San Diego’s Scripps Hospital
Representing the second phase of a four-phased, $41.3 million expansion and remodeling project, the new addition doubles the size of the existing emergency department and trauma center to encompass a combined 27,000 square feet of space.