flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Free webinar on Designing and Building Green Schools scheduled for June 20

Free webinar on Designing and Building Green Schools scheduled for June 20

USGBC Center for Green Schools and other experts to present practical tips.


By Posted by Tim Gregorski, Senior Editor | June 13, 2012

Contractors, architects, code officials and other building industry professionals interested in learning ways to develop healthier, more energy-efficient schools can gain practical insights from industry-leading experts during the GreenExpo365 "Green Schools 'Breakout Session' " June 20, 2012.

GreenExpo365.com will host a series of four free webinars in conjunction with the U.S. Green Building Council (USGBC) Center for Green Schools, covering multiple design and construction topics for green schools. Such schools can help improve student learning and faculty retention, as well as reduce operating and maintenance costs, according to USGBC. www.greenexpo365.com

The "Green Schools 'Breakout Session' " presentation schedule for Wednesday, June 20 is:

8:00 a.m. Pacific / 11:00 a.m. Eastern
"Green Schools 101: Leveraging the Power of Design to Transform Childhood Wellness"
Steve Davis, AIA, LEED AP, Director of Sustainable Design, VMDO Architects; and Matt Trowbridge, Assistant Professor, University of Virginia School of Medicine

9:30 a.m. Pacific / 12:30 p.m. Eastern
"In the Office and in the Community: Contractor and Architect Resources to Transform our Nation's Schools"
Jenny Wiedower, LEED Green Associate, K-12 Manager, USGBC Center for Green Schools; Nate Allen, Schools Advocacy Lead, USGBC Center for Green Schools; and Emily Knupp, LEED AP, Grassroots Outreach Coordinator, USGBC Center for Green Schools

11:00 a.m. Pacific / 2:00 p.m. Eastern
"Net-Zero Energy Schools: Beyond Platinum"
Paul C. Hutton, AIA, LEED AP, Principal, Hutton Architecture Studio

1:00 p.m. Pacific / 4:00 p.m. Eastern
"Steel Curtain Wall Glazing Systems for Green School Design"
Tysen Gannon, LEED AP, Gannon Associates; and Gregory J. Smolley, AIA, AICP, LEED AP, Principal JCJ Architecture

All sessions are open to registered users of GreenExpo365. Most sessions are AIA Continuing Education-credit eligible, and registration is free. For more information, visit www.greenexpo365.com. +

Related Stories

| May 18, 2011

Eco-friendly San Antonio school combines history and sustainability

The 113,000-sf Rolling Meadows Elementary School in San Antonio is the Judson Independent School District’s first sustainable facility, with green features such as vented roofs for rainwater collection and regionally sourced materials.

| May 18, 2011

New Reform Jewish Independent school opens outside Boston

The Rashi School, one of only 17 Reform Jewish independent schools in North American and Israel, opened a new $30 million facility on a 166-acre campus shared with the Hebrew SeniorLife community on the Charles River in Dedham, Mass.

| May 18, 2011

Design diversity celebrated at Orange County club

The Orange County, Calif., firm NKDDI designed the 22,000-sf Luna Lounge & Nightclub in Pomona, Calif., to be a high-end multipurpose event space that can transition from restaurant to lounge to nightclub to music venue.

| May 18, 2011

Lab personnel find comfort in former Winchester gun factory

The former Winchester Repeating Arms Factory in New Haven, Conn., is the new home of PepsiCo’s Biology Innovation Research Laboratory.

| May 18, 2011

Addition provides new school for pre-K and special-needs kids outside Chicago

Perkins+Will, Chicago, designed the Early Learning Center, a $9 million, 37,000-sf addition to Barrington Middle School in Barrington, Ill., to create an easily accessible and safe learning environment for pre-kindergarten and special-needs students.

| May 18, 2011

Raphael Viñoly’s serpentine-shaped building snakes up San Francisco hillside

The hillside location for the Ray and Dagmar Dolby Regeneration Medicine building at the University of California, San Francisco, presented a challenge to the Building Team of Raphael Viñoly, SmithGroup, DPR Construction, and Forell/Elsesser Engineers. The 660-foot-long serpentine-shaped building sits on a structural framework 40 to 70 feet off the ground to accommodate the hillside’s steep 60-degree slope.

| May 18, 2011

New center provides home to medical specialties

Construction has begun on the 150,000-sf Medical Arts Pavilion at the University Medical Center in Princeton, N.J.

| May 18, 2011

Improvements add to Detroit convention center’s appeal

Interior and exterior renovations and updates will make the Detroit Cobo Center more appealing to conventioneers. A new 40,000-sf ballroom will take advantage of the center’s riverfront location, with views of the river and downtown.

| May 18, 2011

One of Delaware’s largest high schools seeks LEED for Schools designation

The $82 million, 280,000-sf Dover (Del.) High School will have capacity for 1,800 students and feature a 900-seat theater, a 2,500-seat gymnasium, and a 5,000-seat football stadium.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021