Jason Freeland, who was recently named to Building Design+Construction’s 40 Under 40 Class of 2012, has been promoted to vice president at Heery International.
In his new position, Freeland serves as the director of Heery’s health facilities design studio in Atlanta. He is responsible for strategic direction, marketing and operations for all of the studio’s health care projects.
Freeland has more than 12 years of experience in designing health care facilities, with a focus on acute care hospitals, ambulatory care centers, and wellness campus master planning. He has worked with a wide variety of clients, ranging from local institutions to large health care management corporations, as well as federal agencies such as the Department of Defense and Department of Veterans Affairs. Some of his recent projects include: lead design architect and planner for a major replacement hospital master plan and concept design in Kaiserslautern, Germany; a master facility plan for a 1.5-million-square-foot wellness campus and acute care hospital in Moreno Valley, California; and design for a 315-bed inpatient tower addition in San Juan, Puerto Rico.
A registered architect in Georgia and Tennessee, Freeland received a bachelor of architecture degree from the University of Kentucky and is currently pursuing an MBA at Emory University’s Goizueta Business School.
He is a member of the American Institute of Architects, a LEED-accredited professional, and a certified member of the American College of Healthcare Architects. BD+C
Related Stories
| Feb 2, 2012
Call for Entries: 2012 Building Team Awards. Deadline March 2, 2012
Winning projects will be featured in the May issue of BD+C.
| Feb 2, 2012
VLK Architects selected for new Cypress, Texas elementary school
The Bridgeland Elementary School will be a new prototype school for the District. Designed to meet the requirements of The Collaborative for High Performance Schools.
| Feb 2, 2012
Mortenson Construction to build 2.4 MW solar project in North Carolina
Located on a 12 acre site in the Sandhills region, the 2.4 megawatt (MW) system is expected to generate approximately 3.5 million kilowatt hours (kWhs) of clean electricity on an annual basis.
| Feb 2, 2012
Shawmut Design and Construction launches sports venues division
Expansion caps year of growth for Shawmut.
| Feb 2, 2012
Fire rated glazing helps historic university preserve its past
When the University embarked on its first major addition since the opening of Hutchins Hall in 1933, preserving the Collegiate Gothic-style architecture was of utmost importance.
| Feb 2, 2012
Delk joins Gilbane Building Co.
Delk to focus on healthcare construction programs and highly complex higher education facilities for Gilbane Building Company’s Southwest region.
| Feb 2, 2012
Next phase of construction begins on Scripps Prebys Cardiovascular Institute
$456 million Institute will be comprehensive heart center for 21st Century.
| Feb 1, 2012
Increase notched in construction jobs, but unemployment rate still at 16%
AGC officials said that construction employment likely benefited from unseasonably warm weather across much of the country that extended the building season.
| Feb 1, 2012
Replacement windows eliminate weak link in the building envelope
Replacement or retrofit can help keep energy costs from going out the window.
| Feb 1, 2012
‘Augmented reality’ comes to the job site
A new software tool derived from virtual reality is helping Building Teams use the power of BIM models more effectively.