flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Funding opportunity for field validation of high-impact building technologies

Codes and Standards

Funding opportunity for field validation of high-impact building technologies

Dept. of Energy program targets dynamic interactions with electric grid.


By Peter Fabris, Contributing Editor | July 9, 2020

Courtesy Pixabay

The U.S. Department of Energy (DOE) is offering up to $10 million for government entities to use for field validation of building technologies.

Five to 10 awards are available for programs that enhance the energy efficiency of buildings and provide flexibility services to the electric grid. Selectees will have the opportunity to validate high-impact building technologies for public and commercial buildings.

Field validation is essential to the R&D process to reveal how new technology integrates with traditional building technologies and interacts with systems that computer models cannot fully simulate, DOE says. Field validation allows DOE to collect and share standardized datasets with researchers, technology providers, industry partners, and other end-users, giving them critical information (e.g., energy use, cost savings, interoperability, durability, maintenance, and other benefits).

Applicants must submit a concept paper no later than Monday, July 27, 2020 to be eligible to submit a full application. Full application responses are due no later than Tuesday, September 28, 2020.

Related Stories

| Jan 30, 2012

ZigBee and ISO 50001: Two new standards to make buildings greener

These developments demonstrate the dynamic nature of the market and the continued need for development of program standards of many different types that help builders and owners translate high performance and sustainable buildings goals into practical measures on the ground.

| Jan 30, 2012

New firm-fixed-price rules on federal contracts impact construction industry

Contractors will need to be on the lookout for policies such as the Contractor Accountability for Quality clause.

| Jan 30, 2012

Roofer’s fatal plunge demonstrates need for fall-prevention regulations

“The biggest problem is getting our workers to use the equipment,” says Michael J. Florio, executive director of the organization.

| Jan 26, 2012

Tampa moves to streamlined online permitting system

The system will replace an inefficient patchwork of old software and is designed to provide businesses, homeowners, and contractors with online access to permitting and licensing information.

| Jan 26, 2012

EPA to collect more data, seek comments before finalizing mud rule

The EPA says it will seek more data and is accepting comments until March 5.

| Jan 26, 2012

Industry challenges Connecticut's suit over defective construction work

The dispute arose over multimillion-dollar leaks at the University of Connecticut's law library.

| Jan 26, 2012

Earthquake 'fuse' could save buildings during temblors

The idea is to use an earthquake "fuse" that can prevent the tiny fractures and warps that make structures unsafe after a quake and very expensive to repair.

| Jan 26, 2012

HPD open materials standard for green building materials gains momentum

GreenWizard, provider of a cloud-based product management and project collaboration software, is the latest industry participant to sign on

| Jan 26, 2012

Siemens launches smoke detection knowledge center

New knowledge center web site demonstrates efficacy of smoke detection. 

| Jan 18, 2012

Chile's seismic code upgrades credited with saving lives in 2010 quake

Since 1960, when Chile suffered a 9.5 magnitude quake, the largest ever recorded; the country has steadily improved building codes to protect lives and property.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021