flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Gensler designs New Jersey law firm’s new headquarters space

Office Buildings

Gensler designs New Jersey law firm’s new headquarters space

The HQ occupies 75,000 sf in a 400,000-sf suburban office building.


By David Malone, Associate Editor | September 27, 2017
The workplace area at the Connell Foley headquarters

Photo: Jessica Warren for Gensler

Connell Foley LLP, a New Jersey-based law firm, recently opened its new corporate headquarters at 56 Roseland. The new 75,000-sf space was designed by Gensler and resides in a 400,000-sf suburban office building.

The contemporary space includes a conference center, attorney offices, and support operations on the first floor. The second floor houses a work café/event area, additional offices, and administrative workspace. Bright accents of green and orange throughout the café and support areas juxtapose the subdued color palette of the workspaces. A glass and tile staircase connects the first and second floors.

 

Bright orange and green accents in the pantry

 

The partner offices are approximately 150 sf and have full glass office fronts for light and transparency. The new headquarters space has two entrances: a first-floor visitors’ lobby entrance that incorporates a centralized conference center and hospitality area, and a second-floor entrance for employees that leads to a work café.

Mountain Development Corp. and Square Mile Capital own the building.

 

The tile and glass staircase that connects the two floors

Related Stories

| May 29, 2012

Legrand achieves over 20% energy-intensity reduction in Presidential Challenge

West Hartford headquarters announced as Better Buildings, Better Plants “Showcase” site.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| May 15, 2012

Don’t be insulated from green building

Examining the roles of insulation and manufacturing in sustainability’s growth.

| May 15, 2012

SAGE Electrochromics to become wholly owned subsidiary of Saint-Gobain

This deal will help SAGE expand into international markets, develop new products and complete construction of the company’s new, state-of-the-art manufacturing facility in Faribault, Minn.

| May 14, 2012

Adrian Smith + Gordon Gill Architecture design Seoul’s Dancing Dragons

Supertall two-tower complex located in Seoul’s Yongsan International Business District.

| May 8, 2012

Skanska USA hires Zamrowski as senior project manager

In his new role at Skanska, Zamrowski will serve as the day-to-day on-site contact for select Pennsylvania-based projects during all phases of construction.

| May 7, 2012

BIM in the academy

Lessons for the AEC industry.

| May 3, 2012

Best commercial modular buildings and marketing programs recognized

Judges scored entries on architectural excellence, technical innovation, cost effectiveness, energy efficiency, and calendar days to complete.

| May 1, 2012

Time-lapse video: World Trade Center, New York

One World Trade Center, being built at the site of the fallen twin towers, surpassed the Empire State Building on Monday as the tallest building in New York.

boombox1
boombox2
native1

More In Category



Sustainable Design and Construction

Northglenn, a Denver suburb, opens a net zero, all-electric city hall with a mass timber structure

Northglenn, Colo., a Denver suburb, has opened the new Northglenn City Hall—a net zero, fully electric building with a mass timber structure. The 32,600-sf, $33.7 million building houses 60 city staffers. Designed by Anderson Mason Dale Architects, Northglenn City Hall is set to become the first municipal building in Colorado, and one of the first in the country, to achieve the Core certification: a green building rating system overseen by the International Living Future Institute.


MFPRO+ News

San Francisco unveils guidelines to streamline office-to-residential conversions

The San Francisco Department of Building Inspection announced a series of new building code guidelines clarifying adaptive reuse code provisions and exceptions for converting office-to-residential buildings. Developed in response to the Commercial to Residential Adaptive Reuse program established in July 2023, the guidelines aim to increase the viability of converting underutilized office buildings into housing by reducing regulatory barriers in specific zoning districts downtown. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021