Gilbane Building Co. has been selected to provide construction management services for a new integrated middle and high school in North Reading, Mass.
Designed by Dore & Whittier, the $107 million facility will feature a renovated middle school and newly constructed high school connected by a shared core, which will include a gymnasium, library/media center, cafeteria/kitchen and auditorium.
Additionally, the project scope includes a wastewater treatment plant, demolition of the existing high school and extensive athletic fieldwork.
Gilbane is ranked the #1 builder in the country of K-12 schools by Building Design+Construction, with nearly 400 schools built in the last five years. The North Reading integrated middle and high school will be built in two phases over the next three years. Construction will begin this summer and is scheduled to complete in December 2015. BD+C
Related Stories
| May 25, 2011
Low Impact Development: Managing Stormwater Runoff
Earn 1.0 AIA/CES HSW/SD learning units by studying this article and successfully passing the online exam.
| May 25, 2011
Register today for BD+C’s June 8th webinar on restoration and reconstruction projects
Based on new and award-winning building projects, this webinar presents our “expert faculty” to examine the key issues affecting project owners, designers and contractors in case studies ranging from gut renovations and adaptive reuses to restorations and retrofits.
| May 25, 2011
Hotel offers water beds on a grand scale
A semi-submerged resort hotel is the newest project from Giancarlo Zema, a Rome-based architect known for his organic maritime designs. The hotel spans one kilometer and has both land and sea portions.
| May 25, 2011
Smithsonian building $45 million green lab
Thanks to a $45 million federal appropriation to the Smithsonian Institution, the Smithsonian Environmental Research Center in Edgewater, Md., has broken ground on what is expected to be one of the most energy-efficient laboratories in the country. The 69,000-sf lab is targeting LEED Gold and is expected to use 37% less energy and emit 37% less carbon dioxide than a similar building.
| May 25, 2011
World’s tallest building now available in smaller size
Emaar Properties teamed up with LEGO to create a miniature version of the Burj Khalifa as part of the LEGO Architecture series. Currently, the LEGO Burj Khalifa is available only in Dubai, but come June 1, 2011, it will be available worldwide.