flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Global hotel chain citizenM opens its first Chicago property and its fifth of the year

Hotel Facilities

Global hotel chain citizenM opens its first Chicago property and its fifth of the year

In addition to a 280-room hotel that features locally made artworks, the building includes 289 residential units and 25,000 square feet of retail space.


By Novid Parsi, Contributing Editor | October 12, 2022
citizenM Chicago Downtown ext
Courtesy citizenM.

citizenM, a global chain of affordable luxury hotels, has opened its first Chicago property—its fifth opening of 2022. Located on Michigan Avenue near the Chicago Riverwalk, the newly built, 47-story citizenM Chicago Downtown includes a 280-room hotel as well as 289 residential units and 25,000 square feet of retail space.

For the exterior 2,000-square-foot terrace and entrance walls, citizenM commissioned artist Nina Chanel Abney, who created an abstract artwork that pays tribute to the city while addressing race, gender, and politics. Other artworks throughout the hotel’s shared spaces include a neon piece in the bar area entitled Ding Dong Your Opinion Is Wrong by Daniel van Straalen, as well as works by Muntean/Rosenblum, Yngve Holen, and Rainer Fetting. 

The hotel rooms and interiors took inspiration from the local community, with a mix of contemporary art, photography, and objects by Chicago artists. The hotel chain curated the in-room art in partnership with ArtLifting, a program for artists that have traditionally been underrepresented in the contemporary art market. ArtLifting enables artists who face a variety of challenges, from disabilities to homelessness, to secure income by selling their original paintings, prints, and products.

Designed by Chicago’s bKL, in collaboration with citizenM’s longstanding architecture partner, Concrete, the building features furnishings by Vitra, citizenM’s furniture partner. The guestrooms offer king-size beds, rain showers, widescreen HD TVs with streaming, and room controls (the blinds, temperature, TV, and lights) via an iPad. citizenM Chicago Downtown also has a 24/7 gym and three meeting rooms. 

citizenM, which launched in 2008, now has 10 hotels in the U.S. and 27 worldwide, with plans to have 40 operational properties globally by 2024.

On the Building Team:
Owner and developer: Sterling Bay and citizenM 
Design architect: Concrete (citizenM component), bKL (overall 300 N. Michigan Ave. building) 
Architect of record: bKL
MEP engineer: Hill Group
Structural engineer: WSP
General contractor/construction manager: Linn-Mathes

citizenM Chicago Downtown ext 2
Courtesy citizenM.
citizenM Chicago Downtown int
Courtesy citizenM.

 

Related Stories

| Aug 11, 2010

See what $3,000 a month will get you at Chicago’s Aqua Tower

Magellan Development Group has opened three display models for the rental portion of Chicago’s highly anticipated Aqua Tower, designed by Jeanne Gang. Lease rates range from $1,498 for a studio to $3,111 for a two-bedroom unit with lake views.

| Aug 11, 2010

Architecture Billings Index flat in May, according to AIA

After a slight decline in April, the Architecture Billings Index was up a tenth of a point to 42.9 in May. As a leading economic indicator of construction activity, the ABI reflects the approximate nine to twelve month lag time between architecture billings and construction spending. Any score above 50 indicates an increase in billings.

| Aug 11, 2010

Construction employment declined in 333 of 352 metro areas in June

Construction employment declined in all but 19 communities nationwide this June as compared to June-2008, according to a new analysis of metropolitan-area employment data released today by the Associated General Contractors of America.  The analysis shows that few places in America have been spared the widespread downturn in construction employment over the past year.

| Aug 11, 2010

VA San Diego Healthcare System Building 1 Seismic Correction
San Diego, Calif.

Three decades after its original construction in the early 1970s, the Veterans Affairs San Diego Healthcare System Building 1 fell far short of current seismic codes. This not only put the building and its occupants—patients, doctors, nurses, visitors, and administrative staff—at risk in the event of a major earthquake, it violated a California state mandate requiring all hospitals to either retrofit or rebuild.

| Aug 11, 2010

Casino Queen breaks ground on $2.15 million entertainment venue

The Casino Queen in East St. Louis, Ill., is raising the stakes in its bid to capture a larger share of the local gaming market with the start of construction on a new $2.15 million sports bar and entertainment venue that will enhance the overall experience for guests.

| Aug 11, 2010

Outdated office tower becomes Nashville’s newest boutique hotel

A 1960s office tower in Nashville, Tenn., has been converted into a 248-room, four-star boutique hotel. Designed by Earl Swensson Associates, with PowerStrip Studio as interior designer, the newly converted Hutton Hotel features 54 suites, two penthouse apartments, 13,600 sf of meeting space, and seven “cardio” rooms.

| Aug 11, 2010

HDR, Perkins+Will top BD+C's ranking of the nation's 100 largest healthcare design firms

A ranking of the Top 100 Healthcare Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

boombox1
boombox2
native1

More In Category



3D Printing

3D-printed construction milestones take shape in Tennessee and Texas

Two notable 3D-printed projects mark milestones in the new construction technique of “printing” structures with specialized concrete. In Athens, Tennessee, Walmart hired Alquist 3D to build a 20-foot-high store expansion, one of the largest freestanding 3D-printed commercial concrete structures in the U.S. In Marfa, Texas, the world’s first 3D-printed hotel is under construction at an existing hotel and campground site.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021