flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Goettsch Partners’ and Lead8’s mixed-use complex begins construction in Changchun, China

Mixed-Use

Goettsch Partners’ and Lead8’s mixed-use complex begins construction in Changchun, China

The complex includes a 980-foot tower.


By David Malone, Associate Editor | January 2, 2019
Changchun CR Center designed by Goettsch Partners

Courtesy Goettsch Partners.

Changchun CR Center, mixed-use complex spread across an eight-acre parcel in Changchun China, will comprise multiple towers that include office space, high-end residential units, and fully furnished serviced apartments. Goettsch partners is designing the main tower while Lead8 is designing the center’s retail and entertainment center.

The development’s tallest tower is a 980-foot skyscraper that will feature a 66th-floor observation deck in its illuminated crown that overlooks the adjacent Mudan Yuan park and lake. CR Land will occupy a 63-story, 1.5-million-sf office tower that includes direct connection to the subway.

 

See Also: Bangkok’s latest mega shopping mall features one of the world’s longest pillarless all-glass facade

 

At the main tower’s base is the MixC RDE Center, Lead8’s concept for China’s popular MixC brand. The retail and entertainment complex features an integrated retail street with luxury brand stores, pop-up exhibitions, and fine-dining functions year-round. A glass façade establishes a visual connection with the street to enhance the MixC RDE Center’s impact on Changchun’s surrounding urban life.

The Changchun CR Center is slated to open in 2021. It is the third major collaboration for Goettsch Partners, Lead8, and developer China Resources Land.

 

Changchun CR Center in Changchun ChinaCourtesy Goettsch Partners.

Tags

Related Stories

Wood | Apr 13, 2022

Mass timber: Multifamily’s next big building system

Mass timber construction experts offer advice on how to use prefabricated wood systems to help you reach for the heights with your next apartment or condominium project. 

Office Buildings | Apr 11, 2022

SOM-designed office tower aims to promote health and wellness

Skidmore, Owings & Merrill (SOM) recently completed work on 800 Fulton Market, a new mixed-use office building in Chicago’s historic Fulton Market/West Loop neighborhood.

Multifamily Housing | Mar 29, 2022

Here’s why the U.S. needs more ‘TOD’ housing

Transit-oriented developments help address the housing affordability issue that many cities and suburbs are facing.

Multifamily Housing | Feb 24, 2022

First new, mixed-use high-rise in Detroit’s central business district in nearly 30 years opens

City Club Apartments completed two multifamily projects in 2021 in downtown Detroit including the first new, mixed-use high-rise in Detroit’s central business district in nearly 30 years.

Office Buildings | Feb 23, 2022

The Beam on Farmer, Arizona’s first mass timber, multi-story office building tops out

The Beam on Farmer, Arizona’s first mass timber, multi-story office building, topped out on Feb. 10, 2022.

Mixed-Use | Feb 9, 2022

David Chipperfield Architects to design Schützenstraße mixed-use development in Munich

The firm recently won a competition for the project.

Mixed-Use | Jan 13, 2022

Details unveiled for Atlanta’s Campus 244 mixed-use development

S9 Architecture is designing the project.

Mixed-Use | Jan 10, 2022

Mixed-use Arsenal Yards completes in Watertown’s East End

PCA master-planned the seven-building, one million sf destination and designed the urban village, residences, and open spaces.

Mixed-Use | Jan 5, 2022

Waterfront Station II breaks ground in Washington, D.C.

The mixed-use project will include 30% affordable housing.

Mixed-Use | Dec 21, 2021

Riverside Wharf will be Miami’s newest entertainment complex

Cube3 Architects is designing the project.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021