flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Grimshaw wins competition to design Shenzhen Airport East Integrated Transport Hub

Airports

Grimshaw wins competition to design Shenzhen Airport East Integrated Transport Hub

The competition sought to find a design that created an integrated intermodal transport hub that could act as a new urban gateway.


By David Malone, Associate Editor | May 27, 2021
Shenzhen Airport East Integrated Transport Hub exterior at sunset

Images courtesy Grimshaw

A multi-disciplinary design team led by Grimshaw, alongside Mott MacDonald, China Aviation Planning and Design Institute (AVIC CAPDI), and Beijing Urban Construction Design and Development Group (BJUCD) has been selected as the winner of a competition for Shenzhen Airport East Integrated Transport Hub.

The project will improve the journeys of thousands of daily commuters by providing easy transfers between high speed rail and other public transport modes. The hub will also provide connections and terminal facilities for passengers traveling to and from Shenzhen Bao’an International Airport.

Passengers will enjoy grand arrival and departure experiences as they travel through the hub where flowing architectural forms and naturally daylight spaces will help to guide people on their journey’s through the interchange.

 

Shenzhen Airport East Integrated Transport Hub aerial

 

The design takes its inspiration from the Mangrove tree, which has special significance in Shenzhen and is one of the planet’s most effective carbon absorbers. The natural form of the tree’s diverse root eco-system inspired the journey passengers will take both above and below ground, landslide and airside.

“Not only does this have symbolic value as an important tree to Shenzhen, but it has led us to a solution for the building that is highly efficient. It will also be a wonderful place for people to occupy and travel through,” said Jolyon Brewis, Grimshaw Partner, in a release.

The project is designed to achieve LEED Platinum.

Tags

Related Stories

Airports | Oct 31, 2018

Foster + Partners’ Mexico City Airport has been cancelled

The project was set to cost $13.3 billion.

Airports | Aug 3, 2018

Airport trends 2018: Full flights with no end in sight

As service demand surges, airports turn to technology, faster building techniques.

Airports | May 31, 2018

Denver's airport city

Cultivation of airport cities is an emerging development strategy shaped by urban planners, civic leaders, airport executives, and academics.

| May 24, 2018

Accelerate Live! talk: Security and the built environment: Insights from an embassy designer

In this 15-minute talk at BD+C’s Accelerate Live! conference (May 10, 2018, Chicago), embassy designer Tom Jacobs explores ways that provide the needed protection while keeping intact the representational and inspirational qualities of a design.

Retail Centers | Apr 19, 2018

Miami International Airport is home to the first Johnnie Walker store in the U.S.

The store will be a permanent fixture in the airport’s North Terminal.

Airports | Feb 21, 2018

Terminal Modernization: Why Bother? Part II

This is the second post in our series examining why airport operators should bother to upgrade their facilities, even if capacity isn’t forcing the issue.

Airports | Feb 7, 2018

LaGuardia Airport receives eight private work booths in Terminal B

 The hub sees over 15 million travelers annually.

Libraries | Jan 29, 2018

Commercial plane that skidded off the runway may become Turkey’s newest public library

The plane was removed from its cliffside perch five days after the incident.

Giants 400 | Oct 5, 2017

On wings of gold: Alternative financing schemes are propelling the high-flyin’ air terminals sector

The $4 billion renovation of New York City’s LaGuardia Airport is the first major U.S. aviation project delivered using a public-private partnership (P3) model.

Giants 400 | Oct 3, 2017

Top 30 airport engineering firms

AECOM, Burns & McDonnell, and Arup top BD+C’s ranking of the nation’s largest airport sector engineering and EA firms, as reported in the 2017 Giants 300 Report.

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021