flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

GSA Recognizes the Best in Public Architecture

GSA Recognizes the Best in Public Architecture

Design Award Winners Showcase Federal Government's Commitment to Sustainable and Innovative Design


January 21, 2011
United States Land Port of Entry, Warroad, Minn.
United States Land Port of Entry, Warroad, Minn.

WASHINGTON, Jan. 20, 2011 -- Today, the U.S. General Services Administration recognized the best in public architecture and civilian federal workplaces at the 2010 GSA Design Awards in Washington, D.C. This year's 11 award winners showcase the federal government's commitment to cutting-edge architectural design and its focus on sustainability. 

"GSA is working hard to change the look and feel of federal buildings," said GSA Administrator Martha Johnson. "We are making the investments now to save energy and taxpayer money in the future. The winning projects mark not just innovation in design, but also, rapid progress toward our nation's sustainability goals."

The biennial GSA Design Awards celebrate the best federal civilian workplaces, including land ports of entry, federal courthouses, and office buildings.  The winners are selected by a jury of private sector design and building professionals. 

"Through collaboration with some of the best architects and engineers in the country, we are creating a welcoming and sustainable federal presence in communities across the country," said GSA Commissioner of Public Buildings Robert A. Peck. "GSA's Design Awards celebrate the energy and creativity of everyone who works tirelessly to deliver the best in public architecture."

The 2010 GSA Design Award winners are:

  • United States Land Port of Entry, Warroad, Minn. – ARCHITECTURE AND INTERIOR DESIGN HONORS; CONSTRUCTION, ENGINEERING, LANDSCAPE ARCHITECTURE CITATIONS
  • United States Land Port of Entry, Massena, N.Y. – ARCHITECTURE AND ART CITATIONS
  • United States Land Port of Entry, Calais, Maine – ARCHITECTURE CITATION
  • Historic District of Columbia Courthouse, Washington, D.C. – PRESERVATION CITATION
  • United States Courthouse, Cedar Rapids, Iowa – PRESERVATION CITATION
  • Federal Parking Garage, San Juan, Puerto Rico – ON-THE-BOARDS ARCHITECTURE CITATION
  • United States Land Port of Entry, Van Buren, Maine – ON-THE-BOARDS ARCHITECTURE CITATION
  • Mariposa Land Port of Entry, Nogales, Ariz. – ON-THE-BOARDS COMMUNICATIONS CITATION
  • Peter W. Rodino Federal Building modernization, Newark, N.J. – ON-THE-BOARDS ENGINEERING CITATION
  • Dr. A.H. McCoy Federal Building modernization, Jackson, Miss. – ON-THE-BOARDS URBANISM
  • United States Courthouse, San Diego, Calif. – ON-THE-BOARDS URBANISM

For more information about the GSA Design Excellence Awards, visit gsa.gov/designawards.

As the federal government's workplace solutions provider, the U.S. General Services Administration works to foster an effective, sustainable and transparent government for the American people. GSA's expertise in government workplace solutions include:

    * Effective management of government assets including more than 9,600 government-owned or leased buildings and 210,000 vehicles in the federal fleet, and preservation of historic federal properties;

    * Leveraging the government's buying power through responsible acquisition of products and services making up more than 11 percent of the government's total procurement dollars;

    * Providing innovative technology solutions to enhance government efficiency and increase citizen engagement; and,

    * Promoting responsible use of federal resources through development of governmentwide policies ranging from federal travel to property and management practices.

Related Stories

| Feb 13, 2012

New medical city unveiled in Abu Dhabi

SOM’s design for the 838-bed, three-million-square foot complex creates a new standard for medical care in the region.

| Feb 10, 2012

Task force addresses questions regarding visually graded Southern Pine lumber

Answers address transition issues, how to obtain similar load-carrying capabilities, and why only some grades and sizes are affected at this time. 

| Feb 10, 2012

Atlanta Housing Authority taps Johnson Controls to improve public housing efficiency

Energy-efficiency program to improve 13 senior residential care facilities and save nearly $18 million.

| Feb 10, 2012

Besculides joins New York Office of Perkins Eastman as associate principal

Besculides joins with more than 17 years’ experience in design, business development, and account management for the government, healthcare, and corporate practice areas with a particular focus on the financial and media sectors.

| Feb 10, 2012

Mortenson Construction research identifies healthcare industry and facility design trends

The 2012 Mortenson Construction Healthcare Industry Study includes insights and perspectives regarding government program concerns, the importance of lean operations, flexible facility design, project delivery trends, improving patient experience, and evidence-based design. 

| Feb 10, 2012

LAX Central Utility Plant project tops out

Construction workers placed the final structural steel beam atop the Plant, which was designed with strict seismic criteria to help protect the facility and airport utilities during an earthquake.

| Feb 8, 2012

Nauset completes addition and renovation for Winchester senior living community

Theater, library, fitness center, and bistro enhance facility.

| Feb 8, 2012

Mega-malls expanding internationally

Historically, malls have always been the icons of America – the first mall ever was built in Minneapolis in 1956.

| Feb 8, 2012

World’s tallest solar PV-installation

The solar array is at the elevation of 737 feet, making the building the tallest in the world with a solar PV-installation on its roof.

| Feb 7, 2012

AIA introduces seven new contract documents to Documents-On-Demand service??

AIA Contract Documents are widely-used standard form contracts among the building industry to support construction and design projects.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021