flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

GSA Recognizes the Best in Public Architecture

GSA Recognizes the Best in Public Architecture

Design Award Winners Showcase Federal Government's Commitment to Sustainable and Innovative Design


January 21, 2011
United States Land Port of Entry, Warroad, Minn.
United States Land Port of Entry, Warroad, Minn.

WASHINGTON, Jan. 20, 2011 -- Today, the U.S. General Services Administration recognized the best in public architecture and civilian federal workplaces at the 2010 GSA Design Awards in Washington, D.C. This year's 11 award winners showcase the federal government's commitment to cutting-edge architectural design and its focus on sustainability. 

"GSA is working hard to change the look and feel of federal buildings," said GSA Administrator Martha Johnson. "We are making the investments now to save energy and taxpayer money in the future. The winning projects mark not just innovation in design, but also, rapid progress toward our nation's sustainability goals."

The biennial GSA Design Awards celebrate the best federal civilian workplaces, including land ports of entry, federal courthouses, and office buildings.  The winners are selected by a jury of private sector design and building professionals. 

"Through collaboration with some of the best architects and engineers in the country, we are creating a welcoming and sustainable federal presence in communities across the country," said GSA Commissioner of Public Buildings Robert A. Peck. "GSA's Design Awards celebrate the energy and creativity of everyone who works tirelessly to deliver the best in public architecture."

The 2010 GSA Design Award winners are:

  • United States Land Port of Entry, Warroad, Minn. – ARCHITECTURE AND INTERIOR DESIGN HONORS; CONSTRUCTION, ENGINEERING, LANDSCAPE ARCHITECTURE CITATIONS
  • United States Land Port of Entry, Massena, N.Y. – ARCHITECTURE AND ART CITATIONS
  • United States Land Port of Entry, Calais, Maine – ARCHITECTURE CITATION
  • Historic District of Columbia Courthouse, Washington, D.C. – PRESERVATION CITATION
  • United States Courthouse, Cedar Rapids, Iowa – PRESERVATION CITATION
  • Federal Parking Garage, San Juan, Puerto Rico – ON-THE-BOARDS ARCHITECTURE CITATION
  • United States Land Port of Entry, Van Buren, Maine – ON-THE-BOARDS ARCHITECTURE CITATION
  • Mariposa Land Port of Entry, Nogales, Ariz. – ON-THE-BOARDS COMMUNICATIONS CITATION
  • Peter W. Rodino Federal Building modernization, Newark, N.J. – ON-THE-BOARDS ENGINEERING CITATION
  • Dr. A.H. McCoy Federal Building modernization, Jackson, Miss. – ON-THE-BOARDS URBANISM
  • United States Courthouse, San Diego, Calif. – ON-THE-BOARDS URBANISM

For more information about the GSA Design Excellence Awards, visit gsa.gov/designawards.

As the federal government's workplace solutions provider, the U.S. General Services Administration works to foster an effective, sustainable and transparent government for the American people. GSA's expertise in government workplace solutions include:

    * Effective management of government assets including more than 9,600 government-owned or leased buildings and 210,000 vehicles in the federal fleet, and preservation of historic federal properties;

    * Leveraging the government's buying power through responsible acquisition of products and services making up more than 11 percent of the government's total procurement dollars;

    * Providing innovative technology solutions to enhance government efficiency and increase citizen engagement; and,

    * Promoting responsible use of federal resources through development of governmentwide policies ranging from federal travel to property and management practices.

Related Stories

Laboratories | Oct 5, 2022

Bigger is better for a maturing life sciences sector

CRB's latest report predicts more diversification and vertical integration in research and production.

Multifamily Housing | Oct 5, 2022

Co-living spaces, wellness-minded designs among innovations in multifamily housing

The booming multifamily sector shows no signs of a significant slowdown heading into 2023. Here is a round up of Giants 400 firms that are driving innovation in this sector.

Contractors | Oct 5, 2022

Materials shortages, cost spikes throwing Design-Bid-Build process out of whack

The traditional Design-Bid-Build delivery process is under considerable stress this year as materials shortages and cost spikes are upending usual practices, according to a new report from JLL.

Green | Oct 5, 2022

In California, a public power provider’s new headquarters serves as a test case for an innovative microgrid and for reducing greenhouse gas emissions

Sonoma Clean Power (SCP), the public power provider for California’s Sonoma and Mendocino Counties, recently unveiled its new all-electric headquarters.

Contractors | Oct 4, 2022

Which comes first, the building or the cost estimate?

At the start of a project, don’t forget to establish financial parameters when you’re discussing the design and program. By establishing the costs up front, you can avoid the pitfalls that might derail your project and guarantee its lasting success.

Fire and Life Safety | Oct 4, 2022

Fire safety considerations for cantilevered buildings

Bold cantilevered designs are prevalent today, as developers and architects strive to maximize space, views, and natural light in buildings. Cantilevered structures, however, present a host of challenges for building teams, according to José R. Rivera, PE, Associate Principal and Director of Plumbing and Fire Protection with Lilker.

| Oct 4, 2022

Rental property owners want access to utility usage data for whole properties

As pressure from investors for ESG reporting mounts, owners of multifamily properties increasingly look to collect whole-building utility usage data.

| Oct 4, 2022

In dire need of affordable housing, Aspen, Colo. will get a development that provides 277 affordable homes

A few miles from downtown Aspen, Colo., a development will provide 277 new affordable homes for an area experiencing a dire affordable housing crisis.

Green | Oct 3, 2022

California regulators move to ban gas heaters for existing buildings

California regulators voted unanimously recently on a series of measures that include a ban on the sale of natural gas-powered heating and hot water systems beginning in 2030.

| Oct 3, 2022

The College of the Holy Cross completes a $110 million performing arts center

In Worcester, Mass., a one-hour drive from Boston, the College of the Holy Cross has completed its $110 million Prior Performing Arts Center.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021