flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Gypsum Association releases updates to wallboard repair standards

Gypsum Association releases updates to wallboard repair standards

Recommendations for repairing joint ridging and fastener pops featured


By BD+C Staff | July 31, 2014
Photo: Findoutwhy via Wikimedia Commons
Photo: Findoutwhy via Wikimedia Commons

The Gypsum Association released updates to both GA-221 Repair of Joint Ridging and GA-222 Repairing Screw or Nail Pops standards publications. Each set of recommendations clarifies best practices associated with common wallboard repairs.

Joint ridging, or beading, is a uniform, fine linear deformation that occurs at the joints of finished and decorated gypsum panel products. Compression at the edges or ends of the panels due to extreme fluctuations of temperature and humidity is the most common cause of ridging; however, misaligned framing can also contribute to the problem. The Gypsum Association recommends waiting until a new structure has experienced at least one complete heating/cooling cycle before making repairs.

Fastener popping occurs most commonly from lumber shrinkage due to initially high moisture content in newly constructed wood framing. Overly long fastener length contributes to the problem. While fastener popping that appears before or during finishing and decoration should be repaired immediately; popping that occurs a month or more into the heating season should wait for repair until the season’s end.

In the case of fastener popping, the secure reattachment of the gypsum panel product to the framing is essential. All new screws or nails should be of the proper length. Key to the repair methods outlined in both GA-221-14 and GA-222-14 is careful sanding and treatment with joint compound as well as observing recommended drying times prior to redecoration.

(https://www.gypsum.org/2014/07/just-released-updated-recommendations-for-gypsum-panel-product-repairs/)

Related Stories

Codes and Standards | Dec 9, 2020

Newly formed Rainscreen Association aims to be recognized authority on rainscreen assemblies

Will address innovations in material performance and building designs.

Codes and Standards | Dec 9, 2020

Investors want building resiliency plans and risk mitigation practices

Owners should assess risk, insurance coverage, and ability to withstand disasters.

Codes and Standards | Dec 4, 2020

OSHA cites more than 200 employers for COVID-19 violations

Agency releases guidance on lessons learned from pandemic inspections.

Codes and Standards | Dec 1, 2020

Pandemic spurs nearly 16 million people to move from major cities

Most of the movement seems permanent.  

Codes and Standards | Nov 30, 2020

USGBC ready to catalyze LEED Positive future

New programs, updates will spur shift to regenerative strategies.  

Codes and Standards | Nov 30, 2020

Finalized 2021 Energy Code leaves out future-proofing provision

Appeals process nixed requirement for residential electrification readiness.

Codes and Standards | Nov 23, 2020

GBCI turns over GRESB ownership to global investment firm

Organization assesses sustainability performance of real estate and infrastructure portfolios and assets.

Codes and Standards | Nov 23, 2020

New industrywide clay brick EPD launched

Contributes toward LEED v.4.0 and v.4.1 materials and resources requirements.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021