flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Gypsum Association releases updates to wallboard repair standards

Gypsum Association releases updates to wallboard repair standards

Recommendations for repairing joint ridging and fastener pops featured


By BD+C Staff | July 31, 2014
Photo: Findoutwhy via Wikimedia Commons
Photo: Findoutwhy via Wikimedia Commons

The Gypsum Association released updates to both GA-221 Repair of Joint Ridging and GA-222 Repairing Screw or Nail Pops standards publications. Each set of recommendations clarifies best practices associated with common wallboard repairs.

Joint ridging, or beading, is a uniform, fine linear deformation that occurs at the joints of finished and decorated gypsum panel products. Compression at the edges or ends of the panels due to extreme fluctuations of temperature and humidity is the most common cause of ridging; however, misaligned framing can also contribute to the problem. The Gypsum Association recommends waiting until a new structure has experienced at least one complete heating/cooling cycle before making repairs.

Fastener popping occurs most commonly from lumber shrinkage due to initially high moisture content in newly constructed wood framing. Overly long fastener length contributes to the problem. While fastener popping that appears before or during finishing and decoration should be repaired immediately; popping that occurs a month or more into the heating season should wait for repair until the season’s end.

In the case of fastener popping, the secure reattachment of the gypsum panel product to the framing is essential. All new screws or nails should be of the proper length. Key to the repair methods outlined in both GA-221-14 and GA-222-14 is careful sanding and treatment with joint compound as well as observing recommended drying times prior to redecoration.

(https://www.gypsum.org/2014/07/just-released-updated-recommendations-for-gypsum-panel-product-repairs/)

Related Stories

Codes and Standards | Aug 11, 2020

Inefficient air conditioning is a key contributor to global warming

More efficient equipment and buildings could make a big difference.

Codes and Standards | Aug 10, 2020

Concrete Institute and Post-Tensioning Institutes expand partnership

Will collaborate on new structural post-tensioned concrete code requirements.

Codes and Standards | Aug 6, 2020

SpeedCore demonstrates excellent fire resistance without additional fire-protective coatings

New York City approves metal-concrete product for all five boroughs.

Codes and Standards | Aug 5, 2020

Designing, redeveloping communities for zero energy needed to address climate change

District heating and cooling systems boost efficiency.

Codes and Standards | Aug 4, 2020

Virginia is the first state to adopt COVID-19 worker safety rules

Include social distancing requirements, notifications when co-worker tests positive, timelines to return to work after recovery.

Codes and Standards | Aug 3, 2020

Report aids local governments on policy options, pathways to electrify new buildings

Document focuses on switching appliances and equipment away from natural gas, propane.

Codes and Standards | Jul 30, 2020

Institute for Market Transformation acquires Energy-Efficient Codes Coalition

Goal is to achieve net-zero construction by 2050.

Codes and Standards | Jul 29, 2020

Crackdowns grow on construction firms that fail to follow COVID-19 guidelines

States, cities, and OSHA enforce social distancing, hand-washing regulations.

Codes and Standards | Jul 28, 2020

California utility adopts climate emergency declaration

Sacramento-region company commits to working towards carbon neutrality by 2030.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021