flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Harley Ellis Devereaux merges with Deems Lewis McKinley

Architects

Harley Ellis Devereaux merges with Deems Lewis McKinley

The combination is expected to bolster HED’s presence in northern California and the K-12 sector.


By John Caulfield, Senior Editor | January 19, 2017

An aerial view of the Susan B. Anthony School in Daly City, Calif., one of the signature projects of Deems Lewis McKinley, which specializes in K-12 design. Image: DLM

Southfield, Mich.-based architectural firm Harley Ellis Devereaux (HED) is joining forces with Deems Lewis McKinley (DLM), a 57-year-old architecture and engineering services firm headquartered in San Franicisco.

The merger, whose terms were not disclosed, is expected to strengthen HED’s presence in the K-12 and Community Education markets, where DLM has established itself as a recognized leader. (Its tagline is “Improving Education through Design,” and 95% of its clients are educational institutions.)

Among its featured projects in that sector is the Bay Farm Elementary School in the Alameda (Calif.) Unified School District, whose eight-acre campus is surrounded on three sides by single-family residences, and adjoined by a five-acre city park. DLM also designed the new 44,000-sf Susan B. Anthony School in Daly City, Calif., which resembles a modern version of a red brick schoolhouse.

This merger expands HED’s presence in California’s Bay Area and Sacramento, DLM’s two primary markets. Prior to this agreement, HED had been managing its accounts and projects in Northern California mostly out of its office in Los Angeles, according to a company spokesperson. Next month, DLM’s staff in San Francisco will relocate to HED’s San Francisco office, which is currently being enlarged. DLM’s employees working out of its Sacramento office will stay there.

“We are looking forward to merging the talents of our two teams and are excited to be part of a very talented studio with deep resources,” says Wallace B. (Wally) Gordon, AIA, LEED AP, President and Chief Executive Officer of DLM, who is staying stay on with HED along with DLM’s principals and senior associates. The one person working in DLM’s office in San Diego—where the firm was founded—will now work from HED’s 20-person office in that city.

Prior to this agreement, HED had 380 employees working from offices in Chicago, Detroit, L.A., San Diego, and San Francisco.

Related Stories

Designers | Sep 5, 2023

Optimizing interior design for human health

Page Southerland Page demonstrates how interior design influences our mood, mental health, and physical comfort.

K-12 Schools | Sep 5, 2023

CHPS launches program to develop best practices for K-12 school modernizations

The non-profit Collaborative for High Performance Schools (CHPS) recently launched an effort to develop industry-backed best practices for school modernization projects. The Minor Renovations Program aims to fill a void of guiding criteria for school districts to use to ensure improvements meet a high-performance threshold. 

Market Data | Sep 5, 2023

Nonresidential construction spending increased 0.1% in July 2023

National nonresidential construction spending grew 0.1% in July, according to an Associated Builders and Contractors analysis of data published today by the U.S. Census Bureau. On a seasonally adjusted annualized basis, nonresidential spending totaled $1.08 trillion and is up 16.5% year over year.  

Sports and Recreational Facilities | Sep 1, 2023

New Tennessee Titans stadium conceived to maximize types of events that can be hosted

The new Tennessee Titans stadium was conceived to maximize the number and type of events that the facility can host. In addition to serving as the home of the NFL’s Titans, the facility will be a venue for numerous other sporting, entertainment, and civic events. The 1.7-million sf, 60,000-seat, fully enclosed stadium will be built on the east side of the current stadium campus. 

Mass Timber | Sep 1, 2023

Community-driven library project brings CLT to La Conner, Wash.

The project, designed by Seattle-based architecture firm BuildingWork, was conceived with the history and culture of the local Swinomish Indian Tribal Community in mind.

Office Buildings | Aug 31, 2023

About 11% of U.S. office buildings could be suitable for green office-to-residential conversions

A National Bureau of Economic Research working paper from researchers at New York University and Columbia Business School indicates that about 11% of U.S. office buildings may be suitable for conversion to green multifamily properties.

Adaptive Reuse | Aug 31, 2023

New York City creates team to accelerate office-to-residential conversions

New York City has a new Office Conversion Accelerator Team that provides a single point of contact within city government to help speed adaptive reuse projects. Projects that create 50 or more housing units from office buildings are eligible for this new program. 

Codes and Standards | Aug 31, 2023

Community-led effort aims to prevent flooding in Chicago metro region

RainReady Calumet Corridor project favors solutions that use natural and low-impact projects such as rain gardens, bioswales, natural detention basins, green alleys, and permeable pavers, to reduce the risk of damaging floods.

Adaptive Reuse | Aug 31, 2023

Small town takes over big box

GBBN associate Claire Shafer, AIA, breaks down the firm's recreational adaptive reuse project for a small Indiana town.

Giants 400 | Aug 31, 2023

Top 35 Engineering Architecture Firms for 2023

Jacobs, AECOM, Alfa Tech, Burns & McDonnell, and Ramboll top the rankings of the nation's largest engineering architecture (EA) firms for nonresidential buildings and multifamily buildings work, as reported in Building Design+Construction's 2023 Giants 400 Report.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021