flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Health Product Declaration Collaborative releases updated HPD Open Standard – Version 2.0

Healthcare Facilities

Health Product Declaration Collaborative releases updated HPD Open Standard – Version 2.0

Advances transparent disclosure of building product contents


By Peter Fabris, Contributing Editor | September 11, 2015
Health Product Declaration Collaborative releases updated HPD Open Standard – Version 2.0

Agnesian HealthCare in Fond du Lac, Wisc. Photo: Royalbroil/Wikimedia Commons

The Health Product Declaration (HPD) Collaborative recently released a major update of HPD Open Standard – Version 2.0.  

The new release addresses two main objectives:  1) Increase usability by users and creators of Health Product Declarations (HPDs) and 2) Harmonize the HPD Open Standard specification with other standards and certifications used in the building industry.

“With Version 2.0 we are now ready to take on the more complex issues of disclosure and supply chain structure, which will greatly improve the usability of the HPD,” said Amanda Kaminsky, Sustainable Construction Manager for The Durst Organization and Chair of the HPD Collaborative.

A Harmonization Task Group was created in 2013 under a grant given to the U.S. Green Building Council by Google Inc. The harmonization work will now move to an implementation phase. The HPD 2.0 Builder, the premier tool for the creation of HPDs, is being upgraded to support Version 2.0.

Related Stories

Coronavirus | Apr 14, 2020

COVID-19 alert: Missouri’s first Alternate Care Facility ready for coronavirus patients

Missouri’s first Alternate Care Facility ready for coronavirus patients

Coronavirus | Apr 10, 2020

COVID-19: Converting existing hospitals, hotels, convention centers, and other alternate care sites for coronavirus patients

COVID-19: Converting existing unused or underused hospitals, hotels, convention centers, and other alternate care sites for coronavirus patients 

Coronavirus | Apr 9, 2020

COVID-19 alert: Robins & Morton to convert Miami Beach Convention Center into a 450-bed field hospital

COVID-19 alert: Robins & Morton to convert Miami Beach Convention Center into a 450-bed field hospital

Coronavirus | Apr 4, 2020

COVID-19: Construction completed on first phase of Chicago's McCormick Place into Alternate Care Facility

Walsh Construction, one of the largest contractors in the city of Chicago and in the United States, is leading the temporary conversion of a portion of the McCormick Place Convention Center into an Alternate Care Facility (ACF) for novel coronavirus patients. Construction on the first 500 beds was completed on April 3. 

Coronavirus | Apr 1, 2020

TLC’s Michael Sheerin offers guidance on ventilation in COVID-19 healthcare settings

Ventilation engineering guidance for COVID-19 patient rooms

Healthcare Facilities | Mar 29, 2020

A ‘roadmap’ for building hospitals in rural and underfunded markets

Hoar Construction’s formula emphasizes preconstruction planning and input from healthcare workers.

Healthcare Facilities | Mar 27, 2020

Designing healthcare for surge capacity

We believe that part of the longer-term answer lies not just with traditional health providers, but in the potential of our cities and communities to adapt and change.

Modular Building | Mar 17, 2020

Danish hospital is constructed from 24 steel frame modules

Onsite construction was completed in two weeks.

Healthcare Facilities | Mar 9, 2020

Mobile wayfinding platform helps patients, visitors navigate convoluted health campuses

Gozio Health uses a robot to roam hospital campuses to capture data and create detailed maps of the building spaces and campus.

Healthcare Facilities | Feb 28, 2020

Valleywise Health Medical Center breaks ground in Phoenix

Cuningham Group Architecture and EYP designed the project.  

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021