flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

A historic courthouse in Charlotte is updated and expanded by Robert A.M. Stern Architects

Government Buildings

A historic courthouse in Charlotte is updated and expanded by Robert A.M. Stern Architects

Robert A.M. Stern Architects’ design retains the original building’s look and presence.


By John Caulfield, Senior Editor | August 2, 2023
Jonas Courthouse and new addition in Charlotte, N.C.
The new wing for the Jonas Federal Building in Charlotte, N.C., brings a 108-year-old structure into the modern era while maintaining its architectural legacy. Image: Francis Dzikowski (OTTO)| Courtesy of RAMSA

The Charles R. Jonas Federal Building and Courthouse in Charlotte, N.C., is a historic Neo-classical edifice built in 1915. The building’s size was tripled in 1933. But more recently it has been badly in need of upgrading to 21st Century justice standards, especially in the areas of security, energy efficiency, and workspaces for support staff.
 
A Building Team that included the designer Robert A.M. Stern Architects and CGL Companies (which specializes in justice-related projects) recently completed a $164.7 million modernization and addition of an eight-story wing that accommodates nine new courtrooms, chambers, and support spaces. The new wing, which rises up behind the original building, maintains the courthouse’s Classical architectural presence along Charlotte’s skyline.

A historic courthouse in Charlotte is updated and expanded by Robert A.M. Stern Architects
The project included more access to outdoor spaces.

Unintrusive modernization of the Charles R. Jonas Federal Building and Courthouse

Charlotte-based Jenkins Peer Architects was AOR on this project, which was completed 11 months ago and had its ribbon cutting last May. fs3|Hodges was the CMa and Brasfield & Gorrie the CMc. The project added 195,719 sf, bringing the building’s total gross size to 315,685 sf. The new wing includes a top-floor Special Proceedings Courthouse and judges’ chambers. The addition is seeking LEED Gold certification.

Unintrusive modernization of the Charles R. Jonas Federal Building and Courthouse
A double-height atrium and stair hall connect the existing building to the new wing.

Inside, a distinguishing feature is how the historic and new facades meet in a double-height stair hall inserted between the two structures. A skylight provides natural light from above the interiors. Outside, RAMSA created a two-story, lighted portico that mimics the columned front of the original building.
 
“We’ve successfully updated the Jonas Courthouse for the future without compromising on what has made it a treasured part of uptown Charlotte’s architectural fabric,” said Kevin Kelly, Partner at RAMSA, in a prepared statement. “For cities across the country, it’s an example of how significant and historic civic infrastructure can be modernized in a way that maintains a distinct character and presence.”
 
This project is the result of a 2012 examination by the U.S. Courts and General Services Administration for the potential reuse of the city-owned Jonas Courthouse to meet long-term housing needs. Charlotte agreed to a property exchange that returned ownership of the Courthouse to the GSA.

Related Stories

| Sep 2, 2014

Ranked: Top green building sector AEC firms [2014 Giants 300 Report]

AECOM, Gensler, and Turner top BD+C's rankings of the nation's largest green design and construction firms. 

| Sep 1, 2014

Ranked: Top federal government sector AEC firms [2014 Giants 300 Report]

Clark Group, Fluor, and HOK top BD+C's rankings of the nation's largest federal government design and construction firms, as reported in the 2014 Giants 300 Report. 

| Aug 25, 2014

Restoration of quake-ravaged Atascadero City Hall affirms city’s strength [2014 Reconstruction Awards]

The landmark city hall was severely damaged by the San Simeon earthquake in 2003. Reconstruction renewed the building’s stability, restored its exterior, and improved the functionality of the interior. 

| Aug 21, 2014

Ranked: Top convention center AEC firms [2014 Giants 300 Report]

Gensler, AECOM, and Hunt Construction top BD+C's rankings of the nation's largest convention center design and construction firms.

| Aug 20, 2014

Seattle's King Street Station thoughtfully restored [2014 Reconstruction Awards]

After years of neglect and botched renovations, King Street Station sparkles once again.

| Aug 14, 2014

How workplace design can empower employees, businesses

Focusing on recent work at Follett and Zurich, CannonDesign’ Meg Osman reveals the power of research, strategy, change management, and measurement to transform businesses for the better.

| Aug 12, 2014

Design firms invited to submit qualifications for St. Petersburg, Fla., waterfront project

The city of St. Petersburg, Fla., invites firms to submit their ideas for a new and improved pier for Florida's fifth largest city.

| Aug 11, 2014

Air Terminal Sector Giants: Morphing TSA procedures shape terminal design [2014 Giants 300 Report]

The recent evolution of airport terminals has been prompted largely by different patterns of passenger behavior in a post-9/11 world, according to BD+C's 2014 Giants 300 Report.

| Aug 8, 2014

Government Sector Giants: Public-sector construction slow, but stirring [2014 Giants 300 Report]

Improving energy performance of existing properties through targeted upgrades and large-scale reconstruction continues to be a federal priority, according to BD+C's 2014 Giants 300 Report. 

| Aug 6, 2014

25 projects win awards for design-build excellence

The 2014 Design-Build Project/Team Awards showcase design-build best practices and celebrate the achievements of owners and design-build teams in nine categories across the spectrum of horizontal and vertical construction. 

boombox1
boombox2
native1

More In Category

Sustainable Design and Construction

Northglenn, a Denver suburb, opens a net zero, all-electric city hall with a mass timber structure

Northglenn, Colo., a Denver suburb, has opened the new Northglenn City Hall—a net zero, fully electric building with a mass timber structure. The 32,600-sf, $33.7 million building houses 60 city staffers. Designed by Anderson Mason Dale Architects, Northglenn City Hall is set to become the first municipal building in Colorado, and one of the first in the country, to achieve the Core certification: a green building rating system overseen by the International Living Future Institute.


Government Buildings

OSHA’s proposed heat standard published in Federal Register

The Occupational Safety and Health Administration (OSHA) has published a proposed standard addressing heat illness in outdoor and indoor settings in the Federal Register. The proposed rule would require employers to evaluate workplaces and implement controls to mitigate exposure to heat through engineering and administrative controls, training, effective communication, and other measures.



Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021