HKS leverages Revu and Bluebeam Studio for IPD on the Banner Health MD Anderson Health Center project

Sponsored Content

HKS leverages Revu and Bluebeam Studio for IPD on the Banner Health MD Anderson Health Center project

Architectural firm streamlines information flow using Bluebeam Revu and Bluebeam Studio to digitize communication and deliver the facility using IPD.


By Bluebeam | September 23, 2013
HKSs MD Anderson Health Center project, Ariz.
HKSs MD Anderson Health Center project, Ariz.

Background

HKS, one of the top architectural firms practicing worldwide, specializes in healthcare, education, sports and hospitality design. The firm recently completed the design of phase two of the Banner Health MD Anderson Health Center in Gilbert, Arizona. This three-story, 110,000-square-foot facility provides additional space on the Banner Gateway Medical Center’s campus, which offers state-of-the-art, comprehensive cancer care. Banner Health selected HKS not only for their extensive experience in healthcare design, but also to work collaboratively with all project partners to digitize communication and deliver the facility using IPD.

Challenge

In order to meet the Owner’s IPD goals, HKS needed to digitize and streamline the flow of information to all team members. In the past, the firm had used a combination of solutions to electronically share and review drawings. However, the project’s General Contractor, DPR Construction, suggested the team use Bluebeam Studio throughout design, bid and build. Studio is the online collaboration feature of Revu, a PDF-based markup and collaboration solution that enables users to review large format drawings, redline them with customizable markups, track feedback and collaborate on PDFs with others in real time. Since HKS had already been using Revu’s PDF markup capabilities on other projects for over a year, it made sense to use Studio to host document-based collaboration sessions to foster greater collaboration among the entire project team.

Using Revu for IPD

Though HKS was no stranger to technology, using Revu enabled the firm to improve their workflows in several ways. Revu’s PDF markup technology, which includes customizable annotations such as text, highlights, pen marks, callouts, clouds, CAD symbols and measurements, took electronic commenting to the next level. In addition to providing the team with the ability to redline PDFs, Revu’s exclusive Tool Chest allowed users to save custom markups and easily standardize markup types, fonts and colors. The Markups list, which tracks every comment placed on the PDF, also enabled HKS to keep tabs on who made comments and when, and provided a simple interface for replying to comments. 

Additionally, Revu enabled HKS to promote collaboration between multiple parties. By using Bluebeam Studio, HKS held online collaboration sessions with consultants, the GC and Owner. Through Studio Sessions, the team reviewed and redlined a single copy of the same PDF, which was hosted online. Everyone could see each other’s markups, but nobody could change anyone’s comments but their own. The timing of these collaboration sessions was flexible – sometimes the team members met together in real time despite their remote locations, and other times they logged in separately. “On previous projects that didn’t use Revu or Bluebeam Studio, we would have to send multiple versions of drawings from each person and filter through repetitive comments,” said Deva Powell, AIA, LEED AP, Project Architect at HKS. “Studio let everyone view and respond to each other’s comments so it was easy to see who needed to complete a task.” 

Results

Using Revu and Bluebeam Studio for IPD was a huge success for HKS and its project partners. In addition to enabling real-time, document-based meetings, Revu eliminated significant paper waste. All project submittals were electronic, and since the Town of Gilbert, Arizona also uses Revu for electronic plan check, the team was able to digitally submit plans for approval. 

Compared to solutions that HKS had used in the past for electronic communication, Revu proved to be much more efficient. “The combination of Revu and Bluebeam Studio helped HKS significantly improve the clarity and speed of project communication for the Banner Health MD Anderson Health Center Project, and reduce our printing and shipping costs,” added John Niziolek, AIA, LEED AP, Senior Vice President and Associate Principal at HKS. “We have already begun using Revu on other projects, and our clients are amazed at how quickly we can document items and send updates.”

To learn more about Revu or download a free 30-day trial, please visit us here.

Contact Bluebeam:
866.496.2140
sales@bluebeam.com
www.bluebeam.com

Related Stories

| Nov 10, 2011

Skanska Moss to expand and renovate Greenville-Spartanburg International Airport

The multi-phase terminal improvement program consists of an overall expansion to the airport’s footprint and major renovations to the existing airport terminal.

| Nov 10, 2011

Suffolk Construction awarded MBTA transit facility and streetscape project

The 21,000-sf project will feature construction of a cable-stayed pedestrian bridge over Ocean Avenue, an elevated plaza deck above Wonderland MBTA Station, a central plaza, and an at-grade pedestrian crossing over Revere Beach Boulevard

| Nov 10, 2011

Thornton Tomasetti’s Joseph and Choi to co-chair the Council on Tall Buildings and Urban Habitat’s Outrigger Design Working Group

Design guide will describe in detail the application of outriggers within the lateral load resisting systems of tall buildings, effects on building behavior and recommendations for design. 

| Nov 9, 2011

Lincoln Center Pavilion wins national architecture and engineering award

The project team members include owner Lincoln Center for the Performing Arts, New York; design architect and interior designer of the restaurant, Diller Scofidio + Renfro, New York; executive architect, FXFOWLE, New York; and architect and interior designer of the film center, Rockwell Group, New York; structural engineer Arup (AISC Member), New York; and general contractor Turner Construction Company (AISC Member), New York. 

| Nov 9, 2011

Sika Sarnafil Roof Recycling Program recognized by Society of Plastics Engineers

Program leads the industry in recovering and recycling roofing membrane into new roofing products.

| Nov 9, 2011

American Standard Brands joins the Hospitality Sustainable Purchasing Consortium

  American Standard will collaborate with other organizations to build an industry-wide sustainability performance index.

| Nov 8, 2011

Transforming a landmark coastal resort

Originally built in 1973, the building had received several alterations over the years but the progressive deterioration caused by the harsh salt water environment had never been addressed.

| Nov 8, 2011

WEB EXCLUSIVE: Moisture-related failures in agglomerated floor tiles

Agglomerated tiles offer an appealing appearance similar to natural stone at a lower cost. To achieve successful installations, manufacturers should provide design data for moisture-related dimensional changes, specifiers should require in-situ moisture testing similar to those used for other flooring materials, and the industry should develop standards for fabrication and installation of agglomerated tiles.

boombox1
boombox2
native1

More In Category

Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021